Drainpipes and Drains

One of the important last jobs was to sort out the cast iron drainpipe from the bathroom - the one that takes the grey water into a hopper and then via 8ft of downpipe and a shoe into the gully at the bottom.  Having lowered the ground level by about five inches beside the house, the recessed gully was now too high; I was not happy with the condition of the downpipe anyway, but since lowering the ground the earthenware had become broken and so water from the bathroom was going all over the ground.  In fact it was quite surprising to see just how much water was being used by the shower - I always thought that they were economical with water but now I wonder.

Hence I decided to gather all the necessary bits together so that I could do the whole thing in one day.  The new 2.5" downpipe and the hopper were actually a renovation of the remaining good bits of the rainwater system which was all replaced over a year ago with 3" (without hoppers).  A thorough job was done with hot air and a scraper, followed by a wire brush and then a couple of coats of black Hammerite (photo right).  All the old shoes were all past it so I had to buy one of those brand new (£££) as well as some coach screws and galvanized washers.

Although I was totally happy to respect the house and comply with all legalities by using cast iron downpipe etc, the gully trap was clearly going to be a new plastic one - and a decent quality OSMA one at that.  Colin the groundworker would never speak to me again if I had bought a W****s own brand!  I then needed an annoyingly short piece of 110mm soil pipe to connect to the main sewer at the inspection cover.  This was really annoying because I needed less than 3 feet of soil pipe but you can only buy 3 metre lengths!  I know it's not expensive (probably just a waste of £10) but just what do you do with the useless piece 2 metres long?  Anyway, I asked both Colin and Steve the plumber and was given a spare bit for nothing, which was just the right length.  The final item was some pea gravel on which to bed the new pipe and gully.

Hence, after all possible preparation, it was time to do the job.  The drainpipe was rather more securely attached to the wall than I had expected, but eventually it gave way to my persuasion (hence the bare bit below the white plastic pipe at the top of the later photo, left).  One of the pins securing the hopper resisted to the end and, sadly, the hopper flange broke leaving a bent pin still in the wall to be ground off later.  I took the drainpipe (2 sections plus a shoe) down carefully in one piece; later, I thought I would try to see if I could separate it, and the first thing I did caused it to break into four pieces!  However, it was quite gratifying to find the pre-existing ('cos they are already rusty) cracks in it, one of which extended lengthwise down the entire six foot section of pipe (see photo right).  Another old crack was 80% of the circumference of the pipe near the collar.  Yes, it was all scrap.

Then it was the turn of the gully and the pipe which was encased in concrete.  It was with a slightly heavy heart that I took my sledgehammer to the earthenware but, within a minute, I had done the deed; happily I could stop feeling guilty as there had clearly been a long-standing leak between the trap and pipe.  After that, it was pretty plain sailing to fit all the bits of the complete new system, starting with the pipe and gully, then working up the downpipe from the shoe to the hopper.  I did find that some of the drilling for the coach screws seemed to be too much for my (fairly new) drill - I think the bricks are VERY tough but perhaps the (not old) drill bits are now knackered as well. Finally I cemented the new soil pipe in the old hole under the frame of the inspection cover, ensuring that the pipe had a very slight fall on it.

Here's a photo of the finished job (compare to the one at the top):
Emboldened by this success, I decided to tackle the new inspection cover (at the back of the extension) which is mounted on some 230mm pipe about 18" high.  This had been left uncut when Colin fitted it so that I could choose the ground level later.  I cut this down to size by sawing about 15" off it, so now I have a trip hazard but at least the level is right, about 3" above the hardcore.  However, since I want to sort the ground fairly soon, it shouldn't be a problem for long.

The next thing to sort will be the pathway alongside the house, between the house and the elevated garden.  I want to make it like a sort of Devon lane instead of how it was during the excavations (right)!  Having lowered the ground level I am loath to refit a path right up to the house again (as if!) and would like to keep the extra four or five inches of wall as breathing space - it definitely all helps.  I have found some heavy duty iron gratings (27" x 9" x 2") at £15 each (which sounds expensive until you find out what old church gratings cost, if you can find them).  If I can work out how to support these (they are probably about 15-20kg each) then I will fit them beside the house wall, and the path surface will then be 9 inches away from the wall.  The path surface will be either concrete or paving slabs or self compacting gravel as successfully used on the drive (or a mixture of all these in different places).  I also need path edging near to the garden wall as I want to have a narrow flower bed at the base of the garden wall.  Plenty of time for that this summer...

Meanwhile, 'Er indoors has just used the newly installed washing machine for the first time.  Happiness indeed!

Saturday, 16 July 2011

Taking a breath in the new house

Slowly the chaos is reducing and we are settling in.  The rented house was handed back successfully on Friday, so for the first time in our lives, after four previous owned properties and a lot of rented ones (mostly RAF married quarters), we are responsible for just one house which we own completely with no mortgage; we can now just concentrate on this one.  The key now seems to be to settle in and take it slowly; at least, that's what it will be like when we have all the basics working.

Unfortunately our shower is not working yet, as I had a problem with the installation, and there are bits everywhere with the shower screen standing on the landing.  In trying to avoid such a situation, I prepared carefully by reading and understanding every step of the instructions but then found that there was a fundamental task which was impossible without a right-angled screwdriver (which I do not possess).  The need for this tool was not mentioned in the instructions and, when I rang the technical centre, they could only say that they sell lots of these showers and no one has ever complained before!  One suggestion they offered was that the attaching screws should be fixed into the wall at an angle to allow the task to be done.  I refused this suggestion as (a) the aluminium channel would be distorted by a pan-headed screw at an angle and (b) the pan-headed screw would not be long enough to get through the plaster at an angle***, and (c) I had already drilled the holes at right angles, since the need for some odd angle was not mentioned in the instructions.  Also, I said that if I did that then my plumber would laugh at me!  I don't often stand on my qualifications but I'm a Chartered Engineer and have never encountered such an idea except, for instance, in screwing wooden studs together.

I found that a certain company had a branch 11 miles away (through horrendous traffic) and their website said that this branch had a right-angled screwdriver in stock, so we went to get it.  Of course, their computer was wrong and so I had to order the thing, and we have to wait for a shower.  Hence an annoyed e-mail regarding their out-of-date website...

The screwdriver should come on Monday, so I can then finish the shower; I'll also do a few other important things this week, like finish the wardrobe and put up a bedroom curtain, and then we're off camping for 17 days, so I won't be posting again for another four weeks.  The plan then will be to get ready for the extension re-build which hopefully will happen in September/October.  In the meantime I just hope this rain stops by next weekend!



*** Of course, in a recently lime plastered wall, any hole which does not penetrate brick or stone is going to cause a big lump of plaster to fall off and create a large hole when you fit a wall plug, and this would be worse if you drill two holes close together...