Showing posts with label Overgrown garden. Show all posts
Showing posts with label Overgrown garden. Show all posts

Sunday, 4 October 2015

Finishing the Summer's Work


Firstly, here's a picture of the finished sash window (upper left window in the picture right). It was a lot of work - probably more than 60 man-hours - but it was worth it simply for the satisfaction of a job well done, plus the appreciation of t'other half!

As I said in August, I'd like to think that the finish on my window is better than the (not so long ago professionally refurbished) window of my neighbour (upper right).  Certainly mine was cheaper and still has the glass that it had when I bought it (although two large panes are not original wavy glass).

Apart from the sash window, I have also done the garden (right) along the side of the house.  This is the bit seen from the kitchen window, so it was really good to get it done before winter.

Having moved half a ton of earth from front to back, the side garden was ready for some turf which I acquired from a well known home store.  The bit recently done is in front of the shed up to the brick wall.  The turf didn't cost the full price as it was quite yellow but, having been down for ten days, it is now indistinguishable in colour from the stuff laid earlier (in three separate phases!) which stretches to the back wall in the distance.  NB The grass ramp is to allow me to push the mower up (as the same mower has to do this raised lawn and the front lawn) - I could lift it up now but know that one day soon it will become impossible for me!

I needed a small amount of top soil to sort out the levels of the last turf beside the shed; this was planned to come from laying a bit more driveway in front but this job just didn't get done for ages until happily it all happened suddenly a few weeks ago.  The new space (left) is only a small addition but I didn't want to loose too much of the lawn out front.  It allows much easier turning of cars in front, as well as a bit more parking when the family visit.

On the left is the view from the back of the garden looking along the side of the house. The back gates still need some work but otherwise now everything is just gardening rather than earth-moving, brickwork or stone work.  As my wife said, "you did all of that yourself!"

Compare this view with the next picture below, which was taken from pretty well the very same spot.
 
Here's a couple of reminders of what it looked like just before we bought it:

Firstly (right upper), looking forward from beside the kitchen, from the far end looking forward to where the back gates and my "repaired" wall now are (where the green bin is in the picture):


Secondly (right lower),  the view looking to the rear from beside what is now the kitchen window:

The tree (visible in both pictures) beside the wall of the house was a lovely pear tree which sadly had to go.  It was so close to the house that a chain saw could not fit between the tree and the wall, but a woodturner friend managed to fell it for me (in exchange for the wood!).  Note the concrete path (along the side of the house) which was about six inches above the floor level inside, whereas my black limestone slabs are five inches below the same floor level.

At the time these photos were taken, we had not actually found the side wall of the garden (somewhere to the left of the bottom photo) as the undergrowth was so thick!  Eventually (about three months later), to our surprise, we found that the garden widens out as you go back (and our neighbour's garden narrows) - I think it is because it follows a boundary along a mediaeval street, which predated both houses!

Wednesday, 9 October 2013

The Year's Work Draws to a Close

My impending operation (see http://diaryofakidneydonor.blogspot.co.uk/) is now only a week away so the end of the year's work is close for me.  I will be in no position to be able to do anything at all strenuous or difficult for some time, almost certainly into 2014. That will of course mean that any lifting is out but even bending down might be too much for me for a while. These last few days have been concentrated therefore on doing various odd bits which either really must be done now (or wait for another year) or else are things which have a benefit exceeding the time and effort required (i.e. they please 'Er Indoors).

One important thing was to put an insert into the chimney pot for the fire in the third bedroom.  We have twice had an idiot wood pigeon fall down this, presumably by falling asleep and overbalancing (and probably not the same bird).  The first time was before I fitted the secondary glazing; it got into the bedroom and I was able to open the window and shoo it out.  The second time was this summer and I had fortunately removed the secondary glazing for ventilation; this time it was sat just up in the chimney refusing to budge, so I had to open the window, reach up with a gloved hand, grab and then quickly throw whatever I had grabbed out of the window.  It flew off leaving a trail of feathers, but it was not impressed at this treatment!

The difficulty in stopping pigeons falling down was that (a) I didn't want to block off the chimney as it needs to be ventilated, (b) the top of the chimney is about 9 feet above the gutters so it is VERY high and (c) the chimney is rectangular and no-one seems to sell a rectangular vented clay hat.  I therefore made my own device but it looks so odd that I'm embarrassed to add a photo of it. To fit it I borrowed a ladder which reached the fascia and used a long pole with a hook on the end and managed to lower the device into place without falling off the ladder.  Thinking about that now, perhaps I shouldn't have taken that risk as any injury would have scuppered the operation next week.

Secondly, I've had to cut the grass which was only laid a couple of weeks ago.  I thought that this would not be needed again before winter but it was almost 10cm high, so I've done a high trim. It looks as though it has been down for years.

Thirdly, I've been doing various bits in the lounge, such as tackling the plaster which was damaged during fitment of the window (the one fitted in June 2011...).  I've also sorted the wooden poles which form the corners of the plaster on the chimney breast and the window bay.  These had been papered over years ago but have now been scraped clean and given a coat of wood hardener which has brought them up nicely.  Finally, I removed the door and cut a half inch off the bottom so that we can lay carpet somewhen; while it was off I decided to remove the brown gunk (it's not paint or varnish) on the inside, ready for painting somewhen. When all the dirty work is done we can seriously plan to buy a carpet, which will please the other half a lot!

The final job was outside again: the ivy in one apple tree had been ignored as it gave privacy and security (as well as cover for birds).  I realised that it was very high so I decided to remove a lot of this to allow the tree to breathe again and possibly grow better next spring. It's a once a year job for the autumn only so it was now or leave it for another year.  Now I have to dispose of the foliage!

Friday, 20 September 2013

The Back Garden takes shape

This post could just as easily be entitled "The Beginning of the End for the Builder's Yard", which is what my side and back garden has been for the last two years since we moved in.  At last I have made some significant progress to making it look right; I previously reported the completion of the paving here - that was a bit premature as actually there were five left to do, which I wanted to do at the same time as the little back wall. 

As I've said before, this wall is just four courses high but fills several important functions: firstly it provides a good edge for the limestone paving laid on sand; secondly it retains a foot of earth at the base of the stone wall where we had lowered the ground level (this was essential for drainage but I was worried about whether we had gone down too far and that the foundation of the wall might erode); thirdly, it's a home for a good amount of spare earth which I had acquired whilst laying the flagstones and finally, it looks good!

At the far end you can see the foundation for the brick barbeque which I hope to do soon.  The last five flagstones are the ones at the top, beside the wall and the barbeque.

The other major task just completed is that yesterday we collected 20 sq m of turf, which I have laid today. 
This is what now permits me to say that it is now more of a garden than a builder's yard (although you can still see a pallet, my mixer and various plastic tubs in the above photo! Here's a photo of the lawn, (left) with the steps and the unfinished stone wall beside the house (which is just out of picture on the right), and you can just see a bit of the low brick wall which runs across the back of the house (on the extreme right).

Top tip for turfing: buy good turf! It should be consistently thin but strong; if not it's a nightmare (I learned that a long time ago; these were great).

I think you will agree that it's a large change from what we bought almost three years ago:
I reckon the above photo is taken from almost exactly the same place as the one of the lawn above it; the ivy covered apple tree is in the middle at the top of the lawn photo (I just pointed the camera down at the lawn a bit more). In fact this overgrown photo was taken in March 2011 after five months work - the "as purchased" condition was so bad that you couldn't even walk there due to the vegetation.

Sunday, 26 August 2012

A Step up in the Garden

Just for a change from walls, I have recently (almost) made a set of steps in the garden.  The need for these steps came from the desire to ensure that the house was never troubled again by the dampness caused by rising ground.  The photo (left) shows the garden as it was, with high ground and the old extension; the new steps are where the scruffy elder was growing, and go down about a foot below the old ground level. We took away the raised earth from beside the house last September (see this entry), and made a sort of lane beside the house with a two to three foot high earth bank.  A retaining wall is being built to keep the earth bank away from the house, and so the steps are needed to reach the higher plateau of what will be a lawn (in due course...).

These steps (right) have been made to last, using Thermalite blocks on a concrete foundation, and concrete slabs as the steps and risers.  The annoying thing here was that I tried to make 6.5 inch steps and the first one came out at 7.5 inches; I tried to correct this on the upper two steps and they still came out at 7.5 inches! Hence the top step, when done, might either have a smaller riser, or else I will be moving soil around to get a decent level at the top.  The blocks are easily cut using a sacrificial saw - I used one left by my builder last October.  However, I had another issue with cutting the concrete paving slabs.  They are REALLY tough, and I now reckon my design is over-engineered as I have taken the trouble to make sure that the slabs are properly supported, but now I don't think that I needed to bother as they are so strong. I've only tried a few cuts and found that my new grinding disc is already completely knackered.  So now my technique is to simply score them with the grinder on both sides, and then split them using a lump hammer and my 3 inch bolster - result!

The sides of the steps (and the rest of the retaining wall) will be faced with small bits of limestone to mimic a dry stone wall, except that the back of the stones will actually be set in mortar - probably NHL3.5.  I then hope to grow plants to trail down the wall from the top, some campion at the bottom and, perhaps, something actually growing in the wall itself to give that effect of a lovely Devon lane.  It's just a personal memory of childhood holidays there...

Wednesday, 18 April 2012

Back to Work

Well, I could now give full details of what is involved in the rather personal procedure I went through last week, but I'll keep it polite.  They removed a small part of me and so I now have to wait 7-10 days for the result of the biopsy; however the doctor is quite sure that in his experience I'm OK.  The procedure actually wasn't too bad - it's quite odd seeing your own insides on a TV screen and the staff were all wonderful.  I have nothing but praise for the way I have been treated at the local NHS Trust hospitals.  The worst bit of the whole affair was the preparation for it when you twice have to swallow a solution of magnesium citrate.  If you know what that is, then you know what I mean!  Google it if you've never heard of it. Enough said.

So, back to work after my enforced rest.  The gateway to the back of our house is through a mock wrought iron gate, which is just visible in the photo (right) on the left of the doorway.  I don't like being visible to people in the street whilst I relax with a beer or cup of tea in the sunny spot at the back of the garden . So, at last, I have erected one of my back gates; this one was the one that I obtained as a swap for some wavy glass which I didn't need.  I had recently spent some time re-painting it, so it was all ready. To fit it I had to remove, refurbish and refit the existing gate post which was attached to the wall beside the front door.  The old 4 by 3 post was a bit rotten but I decided to re-use it as I didn't think it was as bad as it looked (it wasn't) and I thought that it might just be oak (it was).  I trimmed the rotten ends slightly and gave the whole thing a treatment of some proprietary chemical which is said to be good for preventing further rot.  I know this isn't very PC in the period property world but I do not want to have a bit of damp rotting wood attached to the house.

I drilled a hole in one of the quoin stones on the corner beside the door, set well back from the edge, then attached the post with a single huge coach screw.  I was then able to drill the holes in the wood for the other screws in situ, lined up with other suitable stones, so that I could drill through to mark three more holes in the chosen stones.  Then, by swinging the post on the one loosened screw, I could drill the holes in the stones, which was a bit noisy (sorry!).  Then I put the post back, attached coach screws and discovered the bad news: the old post was pretty straight and I had made the hinge line vertical as you look at it, but the thing that caught me out was that the wall wasn't vertical.  Jobs are never as easy as one would like, are they?  So, it was again loosened so that I could swing it away from the holes and fit some packers, then retighten.  I did shear one of the 140 mm coach screws but fortunately by the same method I was able to get to it and remove it with my pipe wrench, and re-tighten everything.  To my surprise the gate went on fairly well with the new T-hinges, et voila! It's even horizontal, and is so low that the local cats won't be able to get under it - if they want to use my garden as a hunting ground then they'll have to jump up and over the new wall - when it's done!  I don't have a photo of the new gate yet as it hasn't stopped raining since I did it.

I now need to do that "new" wall which is going to incorporate two lovely stones with pintles, so that I can then hang the other gate (formerly the back door, now being refurbished).  I reckon that I don't need any permission as there used to be a wall there - I found the old foundations in January - and I don't need permission to do a repair.  In any case, no-one could see that part of the gardens anyway when the enchanted forest was still there, as you can almost see from the photo (left).  This shows how it looked in January last year after (only) the roof had been done; the wall and gates will fill the gap to the left of the corner.

However, I think it might be some time before I manage that lot, as I am turning my attention back to finishing and tidying the new extension, so that it's fully useable.  We have ordered some bits of furniture and I need to buy a couple of wall units for "my own stuff".  I know they won't be big enough for everything but I desperately need somewhere to put my things out of sight without going outside to the over-crowded shed.  If you don't have an attached garage, where do you keep your tools and materials to hand?

Sunday, 1 April 2012

Spring has arrived!

One of the tasks here was to sort out the overgrown front garden.  This was essentially completed last November, when the rest of the old trees were chopped down and the roots grubbed up (see this entry), and then the new trees and hedge were planted (see this entry).  You can then, perhaps understand my joy at the arrival of spring and the sight of all four trees and all of the hedge showing a bumper crop of buds.  The cherry was the first to burst forth into flower (photo right), and the rest are following. NB The funny green on the lawn in the foreground is lawn reinforcement netting.

Last spring I observed that the different types of tree in the churchyard opposite blossomed in sequence, rather than all at the same time.  Thus, I chose to have four trees of similar types and hope that my front garden will have a similar tree in blossom to match one or more in the churchyard; it looks as though the plan is working.  For the record the trees along the front are a Sorbus Aria Lutescens (Whitebeam), a Prunus x yedoensis (Yoshino cherry) and an Amelanchier Arborea, with a hedge of Carpinus Betulus (Hornbeam) beside the front wall and a Malus Rudolph (crab apple) nearer to the house.  In fact, the planting was done on 28th November 2011, so they have only been in the ground for four months; this success is probably due to the skill of the people involved and the quality of their trees; they weren't cheap but I really do believe that if you try to save money on this sort of thing, you might just completely waste your cash by getting a result which doesn't meet your desires, so I consider the money was well spent. [Edit: As a much later correction to this, I noticed in the summer that my Sorbus was not in fact the same species as the tree in the churchyard.  My tree supplier suggests that the one in the churchyard is a Morus (Mulberry) so in fact my “expert” was not so clever after all. Grrrr….]

One other aspect of the front garden is that I was worried about what the locals would say.  I need not have worried, as I have had a considerable amount of unsolicited praise, not just from people who know me but from many random passers-by.  (I only have to work in the front for twenty minutes and I can guarantee that someone I don't know will stop and talk to me.)  Most locals are well aware of both how bad the condition of the house was and the consequent amount of  work done to get it to this standard.  One suspects that a lot of people have been observing (and wondering!) as slowly the front of the house was cleared and improved, together with the many visits by delivery lorries (30+?) and the grab lorry (9 or 10) in the last 17 months.  I think the comments I get now are partly due to their relief that I could have done far worse.  This public reaction is also quite a relief for me, as I didn't really want to annoy the long term locals by completely laying waste the garden!

Thursday, 1 December 2011

Scaffolding, and the Driveway again

As I write, it has all gone quiet outside.  The scaffolders are here removing the scaffolding, but I think after 30 minutes work they have decided it's lunchtime so they have downed tools.  Mind you, these are probably the same wussy ones who didn't put it up (see "The Rebuild Continues") for fear of a bit of rain, so I shouldn't be surprised.  Why turn up at 12.30 and then stop for lunch 30 minutes later? Why not have lunch first and then

Tuesday, 22 November 2011

Roofing and Tree-Felling

Well, we slated the roof last week, which took longer than I thought it would.  After Saturday doing the insulation and battens as reported in my last entry, I spent a day and a half (Monday and Tuesday) doing as much of the tiling as I could on my own as Chris hadn't shown me how to do soakers at the edge. I covered an area with diagonal edge from the base of the wall up to the level of the rooflight, which I reckon means I did over half of the total required (photo right).  I also fitted the rooflight myself before Chris came on Wednesday and we then spent a lot more time doing not much slating; the window was tricky to secure due to

Thursday, 16 June 2011

The Enchanted Forest is no more

The Enchanted Forest is no more - well, it's now just a few overgrown trees with a slightly mysterious shade underneath.  Now it is no longer be possible to hide in the undergrowth which gave this blog its name (see the very first entry last year). I've been putting off the moment for a long time, but this week it was time to do the driveway, together with cutting a gap in the low stone wall and installation of a dropped kerb.  I have been gradually cutting things back in a surreptitious way, but now the public can suddenly see a spacious garden where previously (for over twenty years) they had only seen overgrown shrubs and trees, with lots of ivy and litter.

I had engaged a contractor to clear this overgrown stuff (old photo, left) - especially as it contained lots of brambles which I hate as they seem to hate me first.  However, the contractor failed to appear on Saturday morning, with some excuse about not usually working Saturdays, despite this being the agreement only a week previously; more likely they had too much alcohol on Friday night.  With work on the driveway due to start on Monday I reverted to Plan B and did it myself, thus saving a good deal of money.  However, although successful, I was totally shackered (shattered and knackered) by the end of the day.  The result is a huge clear area (as seen in the top photo) where there used to be hawthorn, brambles, yew and a proliferation of some unidentified shrub, although there were a few bits left which I intended to do on Monday while Colin, my driveway contractor, was doing the dropped kerb.


On Monday I arrived at the house at 8.00am to find that there was already a huge pile of yew branches on the lawn as Colin had already started, having arrived at 7.15 with his own digger and dump truck.  Colin is an absolute whiz on his digger and Ryan, his mate, drives the neat little articulated dump truck.  On one occasion while Colin was scraping the natural layer, I saw a nice looking bit of limestone uncovered and just pointed to it; Colin casually picked it up with the shovel, placed it at my feet and carried on scraping.  Neat.  Part of our contract was the removal of all the plaster, hardcore, slate etc which had accumulated around the site in untidy piles, either loose, bags or plastic tubs.  By the end of the day there was a clear excavation for the driveway (down to the natural brash) and a huge pile of debris near the gateway, as well as a large pile of shrubbery on the lawn.

My contribution was the removal of a 4 metre section of the low front wall, which felt almost a crime as it was probably 180 years old.  (NB That's Colin not me in the photo, with Ryan in the background.)

I arrived on Tuesday to find the huge pile was a lot smaller as the grabber lorry had already visited and removed about 16 tons of it.  I was doing some bathroom tiling later when he returned for the rest and was so quick that I almost missed him.  TOP TIP - if you have more than two or more skips of hardcore for landfill, consider using a grabber lorry which has a capacity of 18 tons, is much easier than filling skips and costs only £150.

By the end of the day the new kerbs and the granite setts were in place, ready for tarmac, and the drive excavation was ready for the ballast.  After the removal of Mount Etna I felt guilty about the greenery on the (shared) lawn, so I moved it all to the back of the house for burning somewhen.  Home for a shower and beer.

Wednesday saw the laying of the hot tarmac, as well as the return of the grabber with 18 tons of ballast.  He also then took away the smaller version of Mount Etna comprising the old tarmac from the pavement plus more hardcore which had been found around the garden.  It turned out that the driver/operator was Ryan's Dad - I do like working in a fairly small place where people know each other.

All that was left to do was for me to point the setts with cement and building sand. It's been a good week already!  We'll revisit the driveway in the autumn when the other trees will be felled and the layout will be revised in the light of experience; then we'll put in the edgings and add the top layer of gravel; at some time I will also have to rebuild the wall ends with my nice bits of coping.  This is the result so far, with our car (just visible) parked on our driveway for the first time (what a pleasure after over seven months of finding a legal parking space every day!):

Sunday, 12 June 2011

It's getting stressful

I suppose it had to get stressful somewhen, and in many ways I have done well to avoid the stress for seven months.  However, we plan to move in by July 8th (and this is June 11th), there is still so much to do in four weeks, and the stress is now getting to me.  I've just been let down by a contractor who was going to clear the front garden for the driveway, so I'm overcoming the stress of that by doing it myself and saving the money.  I've written before about people who have tight project plans which cause them extra stress as well as costing them extra money, and it was my deliberate policy to try to avoid a similar situation. So much for that idea!

The photo (left) shows some electrical switches and sockets.  Not just any switches and sockets, but OUR switches and sockets, which are all now live!  On Friday I had the pleasure of plugging my electrical tools into the proper socket - away with the long extension leads, just plug it in!  It is surprising how tidying up the loose wires coming out from every wall makes the whole place seem so much more completed.

Also, the kitchen has arrived (photo right).  Looking at the huge pile of boxes, I am really glad that I am not fitting it all myself. 

I'd like to think that all remaining work is organised with contractors planned to come along and do their bit at the right moment, but I know that life is not like that.  Every time that I have had even two contractors at the same time, it has been quite a strain with their conflicting requirements, but over the next two weeks I expect to have seven different contractors working, so I anticipate some severe conflict.  The other work to be done is completion of the second fix plumbing and electrics, installation of a newly made window cill, fitting the kitchen sash window, fitting the lounge fire, doing the driveway (with a dropped kerb) and (significantly) fitting the entire kitchen.  Additionally, I have to do certain tasks myself such as grouting the kitchen floor, painting the kitchen walls and finishing the bathroom tiling; then, before moving in, I also have to finish the decorating upstairs and make a wardrobe for the main bedroom, plus then get a couple of carpets fitted.  There is also a slight worry about whether we actually have space for everything, and so I'm wondering if I should buy a large shed or even a big tent!

Sunday, 10 April 2011

Landscaping, crows and "Vision Technicians"

Following on from the recent granting of Planning Permission and Listed Building Consent for our proposed driveway (through the foliage on the left of the photo), there are conditions: one is that we have to get a landscaping plan approved before we can start work on it, and another is that we have to provide two off-road parking spaces and a turning space BEFORE we can occupy the house.  I was surprised by this second one as the absence of the driveway does not prevent us from occupying the house now, and so personally I'm not sure it is legal.  However, as things stand, we need to get on with getting the plan produced and approved.  Hence, this week, I have contacted a landscaper who sent a designer along on Thursday; she will send a plan very soon and hopefully we can avoid any hassle with the Council by just doing what they want.  In any case, I know I need some advice on what to plant and where, as the garden is very prominent and I don't want the passers-by to be upset when we cut down the huge cypress, the ash and the laurel.  The council Tree Officer thought that none of the trees had any particular "amenity value", either singly or as a group (which I was very pleased with!).

This week I have fought a battle against some crows, who were intent on building a nest in one of my chimneys, as evidenced by the twigs that kept falling into the lounge fireplace.  Despite the lovely weather this week I have lit a roaring fire on three days, sometimes with freshly cut yew producing some lovely smoke.  However, I have to report that I think I have lost as, today, there were no twigs in the fireplace but the birds can still be seen putting them in the top!  Now I shall have to wait until the little blighters have produced their family before I can clear the nest and put something over the chimney pot to KEEP THEM OUT!

There seemed to be some possible progress in The Mystery of the Free Step Ladder (see entry in March).  In church on Wednesday one of the churchwardens asked for my help in a task but said that the church stepladder (aluminium, very light) had gone missing recently.  I said that I had a couple of stepladders in my house and could fetch one in a couple of minutes, so I brought the "new" one (aluminium, very light) across for her.  We were now pretty convinced that it was indeed the missing one, but then someone found the Church's ladder in the church hall, so we still have no idea as to where the mystery ladder came from. 
Other highlights this week included successfully doing a trial fit of a bath measuring 150 cm long in a space 148 cm long (right - note recesses in the plaster on the walls); I have put two coats of satin black on the new front door but am still unhappy with the finish; and I have bought from Adam the joiner 20 metres of specially moulded skirting board which is now being installed in the lounge (left).  One other task was to repair some of the many damaged floorboards; I asked a local pine shop if they could produce two specially sized small boards of less than half a square metre, and thought that a trained man with the right machines would do it in less than 15 minutes.  However, I was astounded by the price - £60! - so I turned them down and, with some small difficulty, did them myself (lower right; ignore the gap to the lower board which is yet to be replaced).

Finally, we often have visits by interested parties, or friends of one of the contractors, or even their wives and children just passing!  On Friday it was a friend of Phil's who was wearing a useful looking leather belt/holster, so I asked him what his trade was.  "Vision Technician" he replied, without hesitation.  Seeing my slightly bemused look, Phil clarified things for me: "He's a window cleaner!"

Friday, 25 March 2011

It'll be great when it's finished

Our house continues to attract considerable attention from passers-by, who often stand at the gate and will ask me questions if I am seen.  I have lost count of the number of people who have looked at our house and said "it'll be great when it's finished".  The latest was the blonde lorry driver who delivered the possibly last full load of lime mortar and plaster on Tuesday.  The thing is that I think it's wonderful already!  I'm starting to really think it won't be long now before we can move in, and the kitchen installation is planned for June 13th, so I have a fixed deadline.

This week has seen the completion of the smooth plaster skim of all the walls and ceilings in the whole upstairs, and also down the stairway to the hall.  Hopefully, next week will see the completion of the plaster in the lounge and most of the hall and kitchen.  We have also replaced the old front door and frame with identical new ones (left), specially made at great expense; this was a necessary extravagance, as the old items (right) were really rotten at the base, and well past repair.  The door should get painted this week, and then we can fit the door furniture; one task at home this week was to partially clean the genuine antique doctor's door knocker with vinegar. 

We had a small crisis this week when the only tap in the house refused to turn off, and so I rang Steve the plumber.  He suggested that I tried the rising main which I dreaded as I knew it was very stiff.  Of course, when I tried to close that, it started dripping as well!  Eventually, after an awful lot of water had gone down the drain, Steve came and we now have a new rising main (right, if you don't know what one looks like!) and a new tap (which will be re-used as the outdoor tap later).  Steve will be back next week as the bathroom stuff has arrived and fitting will start.

On the subject of water, I have asked for a water meter (I'm glad it wasn't done before, considering the leak we had).  On Thursday this week a man came to do a survey, and he expressed some surprise at being told to come here because he reckoned that no-one lived here (which is technically true at the moment) and that the house was derelict!

Last Saturday also saw a major step forward as I lit a huge bonfire.  In four hours I burned all the ivy from the front of the house which was cut down last November, the branches from the pear tree which grew three inches from the house, and the buddleia, plus a good number of bits of rotten wood mostly from the joists.  This was a really huge fire (viz the pile in the photo left) and the ashes were still warm on Tuesday afternoon.  The result was that for the first time the whole garden was visible and accessible.  The sense of space and light are a massive improvement over the damp enchanted forest which we encountered on our first visit last August.

Thursday, 3 March 2011

Plaster Progress, and Felling a Tree using Lime Mortar

Good progress on plaster has been made this week.  The first of the skim has been applied and the results are fantastic - Jane has "never seen such smooth plaster" (although I had never really noticed her caressing plaster before!).  I've been asked to always include photos, but seriously, it is very difficult to take interesting or even comprehensible photos of grey plaster.  Trust me - it is smooooth.

For the record, we have been putting on a haired scratch coat of 3:1 (aggregate:lime) mortar, followed by a float coat of the same without hair, then a skim of lime plaster (3:2) which is sponged, followed by a thinner skim of Regency plaster (really fine stuff) which is trowelled smooth.  Pre-mixed products take one variable out of the equation, and are available from Mike Wye (www.mikewye.co.uk) who have been very helpful with advice; I thoroughly recommend them.

It was the eighth delivery of a 900kg pallet of lime mortar and plaster which caused me to tackle a job this week which I had been deferring.  There's a holly tree near our front gate which is smothered in ivy; it's a trunk about ten feet high, very top heavy and leaning towards the pavement, about 25 degrees from vertical.  The rope in the picture right shows the true vertical.  I know how to cut a tree down, but this one needed special attention because of the safety aspects of the leaning - I did NOT want it to fall the wrong way!  I have a new 10 mm nylon rope and just needed something to attach it to in the middle of the lawn.  Thinking about this in the night recently (sad, isn't it?) I realised that the answer was a one tonne pallet of lime mortar!

So, when a delivery came at 10am one day this week, it gave time in the day to tackle this vexing question.  A pair of pallets was piled in the middle of the lawn, with my rope securely attached to the centre (so that the wood could not break and let the rope pull free).  The other end of the rope was tied around the top of the tree.  Then the mortar (in 45 ten litre tubs) was unloaded from the roadside by hand as normal and loaded onto the pallets and the tension in the rope was increased by propping another pallet underneath (see photo left).  Then taking a deep breath, it was time to start sawing a slice out of the tree on the lawn side.  I chose to start about a metre up, as that seemed about right (using my Chartered Engineer's judgement), and I was quite surprised how easy it was to cut the ivy/holly.  The "melon slice" was removed, but I thought that I had only cut about a quarter of the holly.  Nevertheless, we thought we'd try to just pull on the rope before I bothered to cut the opposite side of the tree a bit higher up.  Perhaps Jaye (the spread's labourer) is stronger than he looks, because with three rhythmic pulls, there was sudden movement and the whole top came towards us and fell at our feet (photo right).
The photo of the cross-section (left) shows that, in fact, I had cut about half of the holly tree as well as the complete ivy (which was actually a greater cross-sectional area).

The additional good news is that the view of the house from the road is much improved (right), even though neither Jane nor the neighbour noticed when they walked through the gateway!

Friday, 22 October 2010

Completion of the purchase at last!

This house is now ours, eleven weeks after we first saw it, and I'm off to collect the keys.  Equally importantly, for the first time in our lives, we own a house and have no mortgage - it's a good feeling!  Unfortunately Jane is away today and tomorrow, so I won't be able to carry her over the threshold when we go in for the first time.

Now the real work starts.  So far I have been doing detailed planning and some tinkering on the outside, like getting some ivy down.  I'm now about to take the architect inside as soon as I've got the key.  Next week we hope to have scaffolding erected and the roofer will start work, and I'll use the scaffolding to get rid of the rest of the ivy.  The condition of the roof trusses will be of considerable interest, as will the extent of damage due to water ingress.  I will also get the roofer's carpenter to have a look at the joists (all of upstairs, plus the lounge downstairs) as that is the other major unknown at present.  Just as the stonework behind the ivy was in surprisingly good condition, I am hoping that the joists won't be found to be rotten.

Earlier this week I cut back all of the growth (mostly ivy) along the low stone wall at the front, revealing the coping stones (with cement "repairs").  I almost had an accident when the "For Sale" board broke its Ty-Wrap and fell onto the pavement, to the concern of an old woman a few yards away.  I propped the board up again, but any concern I had about its security was removed an hour later when a man with a van came and took it away.  I also cleared the overgrown front garden of the bottles, cans and litter accumulated over a fair time.  The score was about 50 each of drink cans, glass bottles and plastic bottles, but the following morning someone had dumped two portions of chips, a bit of chicken, a paper wrapper and a drinks can.  Sigh... 

In the course of this work I had conversations with over a dozen people passing by, so it took longer than it might have done.  Clearly, work on this house is going to be a topic of considerable local interest.  Two of these people assumed that the entire building was going to be demolished, and were surprised when I said that it was listed.  Another woman told me about the owner in the sixties who had two Old English Sheepdogs; the garden was well laid out, and the dogs used to sit behind the wrought iron front gates to greet passing schoolchildren like her.  "You mean these gates?" I said, pointing to two rusty gates hidden in the undergrowth!

Saturday, 2 October 2010

Teetering on the brink of progress

Awaiting exchange of contracts to buy, but still expect to complete on Oct 22nd simultaneously with our sale.  I have a contractor ready, and the LBC application is going in, so hopefully the work on the roof will start immediately following completion.  Every time it rains I have been in total frustration at the thought of the holes in the roof...

However, I have to confess that frustration got the better of me last weekend.  I had seen on one of my frequent visits that the dead ivy was coming away from the wall in some places.  Then, lying awake one night, I realised that if it ALL became detached from the wall then there would be a huge weight of ivy hanging from the corner of the roof where it is entwined with the gutter, slates and rafters.  This could only be bad news, so to protect my intended investment I decided to have a go at the ivy without delay. It took me just over two hours, including the left side and tidying up, using my loppers mostly as it was mostly too thick for secateurs.  The following photos show the before and after:
As you can see, I have hacked a line across the ivy back to the wall about ten feet up (OK, I know it's not horizontal), and also removed the ivy from around the bay window and along the bay roof where it was growing under the lead flashing. The cut channel will reduce the weight of potential "hanging ivy" by a good amount if it does decide to fall off, and it also pleases me to see the shape of the windows revealed!

I'm sure the vendor won't mind (or even know), so I'll probably have another go next week.  I didn't want to stand on the flashing but I'll take some boards next time so I can get around the bedroom window.  I will cut another line about five feet higher up on the left and round the corner but I can't go any higher as (a) my ladder won't reach and (b) there are unprotected electricity cables running to the top corner.  (I have already asked the electricity supplier to protect them so that we can put up the scaffolding to do the roof.)

Meanwhile, back to waiting for the good news.  Just how long can this sort of thing take?

UPDATED 12 OCT: Here's a later photo of both halves (ours is just the left hand) after a large part of the ivy just fell off last week (well, I gave it a slight helping hand):

Tuesday, 24 August 2010

It's all in the name

Why the "House in the Enchanted Forest"?  Wanting some early advice, I described the house to the Council's Conservation Officer: "it's the one which is set back from the road, opposite the church in the town centre, the left hand of a pair of Victorian semis".  Her immediate response was "ah, the one in the enchanted forest!"

The house as we first saw it

It was quite an appropriate description really; the right hand half of the two-storey house looks lived-in, well-maintained and loved, but the left hand half, which had attracted my interest, was anything but.  The front left hand corner of the house was covered by ivy which extended over a good deal of the front roof, but the vendors had just chopped a foot or so out of the base of this greenery, revealing stems as thick as my arms, and leaves were just starting to yellow and fall.  The front garden on the left was full of impenetrable shrubbery and trees, including laurel, fir and ash.  This extended back past the side of the house where, surprisingly, the garden widened across what should have been next door's garden.  This area was so densely covered that the far wall was not even visible, but it appeared to be perhaps 10m away from the house.  Holly, apple, pear, blackberry, buddleia and elder all mixed with vicious hawthorn and, in the distance, some species probably unknown to man.  In order to display the house to "advantage", the vendor had paid someone to go along the side of the house with a chainsaw, rather like an explorer hacking his way through the African jungle, thus permitting access to the back.

After finding this "opportunity" on a property website on a Monday evening, I tried Google maps but the aerial photo just showed a roof and lots of greenery, while Streetview did not have a discernible house at all! The next morning I looked around the outside, guessing that there was no-one resident. Externally there was evidence of poor maintenance and much damp, if that is the right word for actual holes in the slate roof. One downpipe was fractured and rainwater had been pouring down the wall; the other downpipe was intended for a water butt which had been replaced by an old and corroded galvanized cold water tank, and the water just went straight out again. Peering through the original (?) sash windows, however, showed an attractive hall and dining room with red and black floor tiles and high ceilings.

Suitably encouraged, I walked up to the market place to find the agents for more details. Before I had really grasped what I was doing, I had booked to view inside. Come Thursday morning, we were pleased to find that the interior was actually better than we had guessed. Upstairs, there's a lot of falling plaster but the floorboards seemed to be in good condition (OK, I know the joists might prove to be a disappointment); there were three good-sized bedrooms and a small bathroom as well. It was also true that you could see the sky through at least two holes in one bedroom ceiling!, but the missing plaster did show some nice riven laths, probably chestnut.

Our dream house?

Other than being listed and not detached, the house was everything that I had ever dreamed of as an old property project; we wanted somewhere stone-built in the centre of an attractive village, but with space to the side and set back from the road as we wanted off-street parking. We didn't fancy front doors opening directly into the living space - Jane likes a good hall as an entrance - nor were we too keen on small rooms with low ceilings in the typical cottage. We also wanted decent transport links, and Jane still has to travel often to London, and she likes having good shops readily available. Here we were minutes from the shops in the town centre with the station for trains to London not much further.

It was time to make up our minds and put our money where our dreams were taking us.