Showing posts with label holidays. Show all posts
Showing posts with label holidays. Show all posts

Saturday, 23 December 2017

Another End of Year Review

One good thing about a blog like this is that it helps me keep track of what I have achieved with this house and, possibly more importantly, what I have NOT achieved! Hence this end of year review is largely for my own benefit.

Frankly, I don't feel I've done much here in 2017. I did accomplish the previously reported refurbishment of the two remaining large sash windows - both hard work but very satisfying to see (and feel the benefit of reduced draughts). I also managed to repair the corner of a back wall where many stones were loose - I was worried that if my neighbour's side was as bad then the wall might collapse but, fortunately, his side was better anyway. The rest of the list from earlier this year is still outstanding.

There has also been a lot of clearing out in the second bedroom where I have made a wardrobe. This clearing task was made much easier after August as our daughter's wonderful wedding dress was used for its intended purpose and now lives at her house. Otherwise my shed is now full of stuff from my Dad's house that I would like to use, restore or sell - that last task seems to be a lot more work than one might think. I have not done much in the garden except to keep it tidy; I was really annoyed when the people at the back started to cut the ivy on my back wall - I asked them to leave as much as they could as it breaks up the appearance of the wall and adds some privacy, as well as giving food and shelter for birds.When they finished, it looked the same on my side, but on their side they had given the bit on top of the wall a short back and sides - the vertical wall was totally clear and so all the ivy on top had been cut off from its roots! Sigh.

It might be considered that I must have been lying around doing nothing this year, but this is definitely not the case. Leisure wise, I have bought a one-tenth share in a small aeroplane which is older than I am, and refreshed my private pilot's licence, so there is a bit of flying to look forward to in 2018.

At the church, we have done a £250k job on the exterior, thanks to a grant from the Heritage Lottery Fund. In the course of this work we suffered some vandalism when some little sod got up the partially completed scaffolding before the alarm was fitted and literally kicked a couple of stained glass windows to pieces - this repair should be complete at last in early January. You can hardly imagine how much work is caused by an incident like that, and most of it fell on my shoulders.

That reminds me of something that I need to pass on about the erection of scaffolding. It appears to be customary trade practice not to fit a scaffolding alarm until the erection of the scaffolding is finished. Now, I can understand why that should be the case for scaffolding around a house, as the alarm will get in the way of the next day's erection work. However, when you are putting up 13 lifts of scaffolding around a church tower, the job will take several days so I cannot understand why the alarm cannot be fitted once you have done the first three or four lifts, as all subsequent work will be above the alarm. If I was the insurers I would be insisting on a change to the current practice, but fortunately they are paying (apart from our excess)...

At one stage recently, one of the two temporary plastic sheets fell out of the window and made everyone very cold for one weekend. To fix this, I hired a 7.2 metre double width scaffold tower which was erected and dismantled by me and two men of similar age. To my surprise, I found that the double width tower was no more difficult to erect
and, in fact, the platforms were easier to manage, so I will use one of these in future. The window job itself took only 25 minutes and our end result is much more secure than that of the professionals who fitted the stuff.

This year we have had a cruise from Jordan to Malaga through the Suez Canal, seeing Petra in Jordan and calling at Crete, Malta, Palma and Gibraltar; we also spent a week in Sicily in September, so we have done OK for holidays. (NB From our cruise we flew back from Malaga and had the most dreadful airport experience of our lives - don't go there! If it's a bad as that on a Sunday in early April, what was it like in August?)

We have become used to being in each other's company for most of the day, almost every day, now that we are both properly retired, and I expect to end my six years as Churchwarden in May 2018, so I will then have even more time on my hands.







Wednesday, 16 September 2015

Serious Damp Issues

I've just returned from a short holiday in Venice - we had never been there before and it seemed like a good place to tick off our list of "must-do somewhen".  The whole place is 
fascinating, and it really takes a visit to understand how this small island (or rather a set of smaller islands) is set in a large lagoon with other inhabited islands around.  Much of the lagoon is very shallow and so is un-navigable by everything except the smallest boats, and it is not clear to the eye whether the sea is taking back the land, or the land is being reclaimed from the sea! Probably a bit of both, I fancy.

The Venetians have not helped their predicament by allowing very large ships to dock on the north side of the main island, i.e. the side furthest from the Adriatic Sea.  To accomodate these 100,000 tonne monsters (each with over 5,000 passengers!) they require to keep the waterway past St Mark's Square dredged to about 50 feet, which surely cannot help but encourage the town itself to settle gently?  We were told that most houses are so damp that the ground floor is not used, and there is often as little as a foot difference between the water and ground that we walked on!

Being seriously interested in old buildings and issues such as dampness, I took a lot of
photos which illustrate the problems they have.  I don't think these are attributable to rising damp (if it really exists!), but more largely due to the continually damp and corrosive atmosphere.  Anything close to the water will be washed frequently by natural or man made waves as well as the damp breeze, and so erosion is hardly surprising and is visible everywhere (photo left).
What matters, sadly, is that there has been much use of CEMENT (aaaargh!) and the effects of this are all too readily visible, especially where repointing has been done.

The next two photos on the right show all too clearly what happens when a lime wall is re-pointed with cement.  It might look fine to start with, but ultimately the brick (or stone) starts to spall (i.e. lose its surface) because of the continual presence of the water in the brick which should escape
via the pointing but cannot.  The upper photo is a classic showing how the brick recedes into the wall.


Cement is also used for rendering, with the result that it comes off in sheets.  The photos left and below show cement render just falling off a brick wall.

Another technical issue if the frequent use of stone in an unnatural bed, i.e. laid with the natural grain (due to being sedimentary) at right angles to the ground.  This encourages vertical splits and just looks wrong anyway, as shown left in a wall where there is also spalling brickwork due to cement pointing.




This sort of thing is evident everywhere, and I fear for the future of the buildings for this reason alone, never mind the rising sea levels.  Unfortunately they seem to have made their natural problems worse by their own poor maintenance practices.  However, on the plus side, they do have lots of lovely old buildings (right), even though most of them look in need of a bit of TLC!