Wednesday, 26 October 2016

Repairs to Large Stone Wall

I have a new neighbour - not the other half of my semi-detached house but the other side.  Their house has a door onto the pavement, whereas my house is set back 15 metres, with the result that there is a wall  between my front garden and their back garden. They have done a phenomenal amount of work on their place in a very short space of time (mostly based on the right principles). One of the things they have done was to remove the huge amount of ivy on this 16" thick limestone wall which, sadly, has revealed that the wall is not in as good a condition as I thought.

The wall is of a mixed construction being partly coursed random rubble and partly roughly
squared - see photo (the bin is just there to give an idea of scale). Where it was clear of ivy (left of picture) there are mostly blocks with good pointing, which is why I thought the whole thing was in good condition; however, much of the rest is coursed random rubble. The whole is capped by 3" limestone slabs, 16" wide and about 30" long; these seem to have been set with a small slope for drainage. Now that the ivy is largely cleared (the darker area where the ladder is), it is apparent that the coursed random rubble is in pretty poor condition with loose or missing mortar, ivy penetrating the wall and loose stones in the first couple of feet down from the top.

The wall starts off pretty vertical (where it leaves the neighbours' house, out of the left side of the above picture) but moving away from the house it has a bow which means that the natural taper has become vertical on their side and a quite marked slope on mine. The top looks awful (left photo) but it's not possible to say what the original slope of the coping was; it has certainly increased a lot in places, but I don't have an clinometer so I can't measure it.
The trouble is that the wall is pretty big. My side is about 8 ft high, and their garden is probably about 3 ft lower than mine (as my garden slopes up and theirs is level throughout), so they have an 11ft wall towering over their patio. A major rebuild is definitely needed; legally I think it's their wall, but it's my ivy. Both houses are listed and in a conservation area. A like-for-like repair does not need LBC but, as it's so high, I'll find someone more experienced to do it for me, rather than do it myself as next year's project. I wouldn't want the responsibility if it fell over later.

I've had a builder look at it and his view is that the bow means that the top has moved over a foot out of true, which is a lot, and so it looks as though the neighbours and I will have a discussion about this with a view to rebuilding the top few feet sometime next spring!

Monday, 18 August 2014

More Odd Jobs

We've been living here more than three years now, and I still have jobs left over from before we moved in. Recently I finished another of these, and 'Er Indoors is very happy with the result so I can feel quite smug.

The hall and lounge both have a wooden corner bead at each vertical right angle; this photo shows the hall as it was after the initial plastering and decoration:

The original feature was to maximise the amount of the visible wood by having a chamfer at the edge of the plaster instead of plastering flat up to the wood in which case you would only see a very small amount of wood. The chamfer allowed perhaps even half of the wood to be seen; of course at some time someone had papered the walls and covered all the wood!  I have been told that this plastering detail used to be quite common and is called a "quirk". 

My plasterer found the chamfer difficult although at each one he did make some sort of effort. As ever, there was no time to sort it before we moved in, so it has waited for my attention until this summer. Back in March I removed the paper and cleaned up the wood. Then in June I cut back the plaster to give a rough 45 degree chamfer on each side, and plastered these chamfers to make them smoother; finally today I applied the limewash to each of the four corners in the lounge (two for the window bay and two for the chimney breast), as well as limewashing various bits (replastered but unfinished) after the fitment of the new window in June 2011.

I'm very pleased that the limewash has dried to match the earlier stuff so you can hardly see the new application. Overall a messy job but well worth it. Now I just have to do the same to the ones in the hall!

I've been busy all summer with various jobs in the garden, as well as finishing a few other old jobs inside like the last of the tiles in the kitchen. One job that got done outside was to attach two pieces of coping on one end of the front wall which had also been waiting three years; as ever, the sort of job that you hope would take one hour actually took almost six.  At least I was right to delay doing it!! Now there's the other side to do, which I already know is a longer job as I have to rebuild the end three feet of wall as well.

The main reason for the lack of progress is that we have had contractors in the church for over four months.  They have laid 50 sq m of limecrete floor with underfloor heating and limestone tiles 2 cm thick, installed toilets and a servery, fitted a new boiler in the tower (instead of in the old damp boiler room) and all the associated drainage, electrics, pipework and the water and gas supplies this entails.  Since the church is Grade I listed, this is all far more complicated in preparation, design and approvals than your average house, and so has occupied a good deal of my time (being churchwarden). Now we just need £400k for the rest of the nave floor.

Friday, 20 September 2013

The Back Garden takes shape

This post could just as easily be entitled "The Beginning of the End for the Builder's Yard", which is what my side and back garden has been for the last two years since we moved in.  At last I have made some significant progress to making it look right; I previously reported the completion of the paving here - that was a bit premature as actually there were five left to do, which I wanted to do at the same time as the little back wall. 

As I've said before, this wall is just four courses high but fills several important functions: firstly it provides a good edge for the limestone paving laid on sand; secondly it retains a foot of earth at the base of the stone wall where we had lowered the ground level (this was essential for drainage but I was worried about whether we had gone down too far and that the foundation of the wall might erode); thirdly, it's a home for a good amount of spare earth which I had acquired whilst laying the flagstones and finally, it looks good!

At the far end you can see the foundation for the brick barbeque which I hope to do soon.  The last five flagstones are the ones at the top, beside the wall and the barbeque.

The other major task just completed is that yesterday we collected 20 sq m of turf, which I have laid today. 
This is what now permits me to say that it is now more of a garden than a builder's yard (although you can still see a pallet, my mixer and various plastic tubs in the above photo! Here's a photo of the lawn, (left) with the steps and the unfinished stone wall beside the house (which is just out of picture on the right), and you can just see a bit of the low brick wall which runs across the back of the house (on the extreme right).

Top tip for turfing: buy good turf! It should be consistently thin but strong; if not it's a nightmare (I learned that a long time ago; these were great).

I think you will agree that it's a large change from what we bought almost three years ago:
I reckon the above photo is taken from almost exactly the same place as the one of the lawn above it; the ivy covered apple tree is in the middle at the top of the lawn photo (I just pointed the camera down at the lawn a bit more). In fact this overgrown photo was taken in March 2011 after five months work - the "as purchased" condition was so bad that you couldn't even walk there due to the vegetation.

Wednesday, 14 August 2013

Window Arch Repair

The windows of the house have bricks to provide good edges around the window, as the walls are made of random rubble.  Above the window is an arched soldier course, i.e. of bricks on their end, and these are called rubbers.  This is, I believe, because the bricks are actually slightly tapered in order to give the arch its shape, and this taper was achieved by rubbing the bricks against each other. 

Above the hall window is the soil pipe we fitted in 2011, and when we did that I observed that the surrounding stonework was not in great nick (see first photo).  I did a bit of pointing in this area last year (or was it 2011?), doing some deep fill and letting it go off before doing the surface bit in an appropriate colour.  So, when I mixed some more coloured mortar the other day (see the previous entry), I was keen to get this area tidied up.  However, it took all of 30 seconds up the ladder to realise that things were worse than I thought: where I had done the deep pointing above the rubbers, there was (already) a 2mm gap between the pointing and the rubbers.  This could only be caused by the rubbers dropping down.

Movement like this is NOT good news, so I called Pete who did the brickwork on the extension in late 2011.  He came round for a look, assured me that he could sort this in less than a day, and duly turned up this week.  He came armed with his Acrow prop and the "Strong Boy", a flat plate which attaches to the top of the Acrow (see second photo)- and yes, it is strong.  He fitted it in under the large stone just below the soil pipe, and also fitted some shaped wood to support the brick arch.  He then proceeded to remove nearly all the mortar below the Strong Boy, and ended up with some stones and all the rubbers loose (aaargh!!).

The next step was to push the arched wood up to restore the shape of the arch and then insert bits of slate between the rubbers (I think in four gaps only) to make the arch secure.  Slate is brilliant for this as, after all, it was produced under thousands of tons of pressure, so in compression it is fantastically strong.  Then it was replace the brickwork and mortar, tidy up the pointing and the job was done (see third photo).

I am very pleased with the result, as it has removed one of my major headaches.  Since I was paying him for the day, he filled in time by doing the drilling job for the kitchen vent (see previous entry), so I got TWO tricky jobs out of the way for the price of one.  Well worth £150, I reckon.


Loose Ends

It's been a mixed bag recently, with three jobs making significant progress after years of procrastination.

In a spirit of tidying up I decided to mix some more of my local sand & lime putty mix for pointing; then I thought I would do some pointing myself, and my daughter visited and did some more!  So the stone wall which I built last year is almost fully pointed at last (right).

Thus encouraged, I then went back to pointing the side wall of the house which I did a couple of years ago (plus a bit last year) under the new window which I fitted.  Beside that window is the downpipe which had a large hole about 9 feet up; the water gushing through this caused severe damage to the wall as it had been happening over a long period of time.  I only realised how bad it was when clearing the gaps out before filling - in one place I could get my flat hand into the hole, and then curl my fingers up in the void.  There were also some bits where some idiot had smeared a thin coat of cement over the wall, which can only hold moisture in, rather than stop it getting in!  I've now re-pointed a good deal of the worst bits on this wall, mindful of the general rule to not re-point unless absolutely necessary; this is good advice, not just for the integrity of the house but also because it really is a tedious job.  I'm quite pleased with the result!

Having done that pointing, I could now attach the shoe on the bottom of the downpipe.  When we took the ground level down in 2011, I had been left with an annoying gap of about 4 inches at the bottom.  I really didn't want to spend £65 on a new 6 ft length, just for that, and I found a shoe which was longer than usual, but it was still a bit high above the drain.  To bring it down I have used a spare elbow with a collar, and cut the bent bit off, so now there are two collars at the bottom (photo left), and it is a perfect fit (although the groundworkers always seem to attach the gully too close to the wall...).

Then I was urged by 'Er Indoors to do the last bit of skirting board in the lounge; it's one of those bits with a right angle that fits beside the chimney breast, and the old one was rotten; when I had a go a while back, it all went wrong because I didn't cut good 45 degree mitres and so the result was awful.  That was pretty discouraging, spending a couple of hours and achieving absolutely nothing, so I left it.

Anyway, today I had another go and not only cut the two pieces successfully but also fitted the result in place AND painted it (photo right).  Once again, I'm pleased that I can choose a job for the day and do it completely without having to go and buy anything at all.



The third job was the drilling of the hole for the vent in the kitchen (left).  This was not done when the kitchen was fitted (errr... two years ago!) as they intended to chain drill a rectangular hole through 18 inches of stone! I was not impressed as I am sure that this would have caused immense damage to the remaining wall.  Today Pete (who did the brickwork on the extension in late 2011) came and drilled it with his 110mm cutter on an SDS drill, which took him about an hour and a half. It's one of those jobs that perhaps I could do myself but really I am quite happy to pay someone who knows what he's doing.

Now that the hole is done I can purchase the necessary bits to duct the extractor over the hob outside instead of re-circulating it - perhaps I will have done that by Christmas?

Thursday, 3 January 2013

Fat Birds and Drunk Slugs

We've been getting some surprising pleasure form watching the antics of the birds in our back garden.  I knew there were lots of bird resident locally, and was quite worried about depriving many of them of their nesting places when we cleared the garden.  Hence I made sure that the hedgerow around the walls of the garden was left as it was, with thick ivy and various other shrubs growing up/on/through it.  Last autumn we put up a bird feeder in which Jane puts those fat balls that you can buy; this hangs from the apple tree just outside the new kitchen window and so we have a good view of the goings-on. 

Firstly, there is a healthy flock of house sparrows here (some of who actually used to live in the wall of our house!), and they are quite adept at imitating blue tits and hanging on the feeder cage to peck the fat.  The apple tree has a high canopy and a single low horizontal branch which is bare for the first ten feet, and there are often three or four sparrows perched there waiting whilst others are feeding.  Then there are some Blue Tits and the odd Great Tit - they prefer not to mix with the sparrows who are quite noisy and possessive.  A surprise earlier in the year was the sight of three juvenile Long-Tailed Tits, and we were very happy recently to have further sightings of several of these relatively unusual birds.  There are a couple of Dunnock who only peck at the bits on the ground which have fallen from the feeder, joined occasionally by a Chaffinch.  Finally, there's a Robin who is more than possessive.  He is a little thug who terrorizes the other small birds to claim ownership of the worn patch immediately below the feeder, and occasionally (largely unsuccessfully) tries his own impersonation of  Blue Tit on the feeder.

The heavy mob obviously are ground feeders as well.  There's a number of Wood Pigeons (and the Robin knows his place with them), but there's also a pair of Collared Doves who dislike the Wood Pigeons!  It's a real soap opera out there sometimes.  Blackbirds are rarely seen - there was a melodious one who used to sing beautifully, up and down the street every morning and evening, but he fell silent in August and so I expect a cat got him. The last of the ground feeders is a mouse who I have seen just twice, when the area was quiet. We also have a Wren who lives in the hedge on the wall, but he is rarely seen and is cetainly not tempted by the fat balls.

The front garden wall is unfortunately just the right height for passers-by to sit on. I don't usually mind this, apart from those who sit there talking loudly, especially when we are trying to sleep, but since I did the secondary glazing this has not been such a problem.   I also object to those who sit there eating and drinking (again, usually at night) and then leave their rubbish in our garden. One of these the other day had clearly had too much to drink, as I went to pick up a can in the morning and found that it was still sealed. Shame I don't drink lager...  At the same time I picked up another open can which clearly had some liquid still inside, and found when I tipped it out that it contained about 20 dead slugs!  Obviously the advice to gardeners to use beer in a can to eradiate slugs does work! 

Sunday, 16 December 2012

Reflections on the Last Two Years

Now that I have a bit more time for activities other than building work, I've been thinking about what has been acheived in the last two years and two months.  Specifically, I've been thinking about two aspects of the work, namely the things I've done which have really pleased me, and the things that I would rather had been done differently.

Under the latter heading come a few things which still bug me:
  • The attitude of the Conservation Officer - this relationship seemed to have gone wrong near the start, but I still don't really know why, other than because (just possibly) the CO really IS an unhelpful person.
  • The fact that Highways at the County Council told me that I could not widen the existing gateway to make a single driveway entrance for both houses as it was too close to a junction, but then (after I had made an entrance in the old wall) they allowed my new neighbour to make a new entrance even closer to the junction!
  • A newly laid slate has slipped from the roof to the gutter, but the roofer has yet to come and fix it.
  • The new kitchen sash window is four over four, not two over two as the rest of the windows.
  • There is still no vent to the kitchen...
  • Thames Water fitted an external meter in the pavement and this has been found to be a joint supply. Now we have to get an internal meter fitted, but that would have been so much easier if done before the new kitchen was fitted, as I intended.
  • My new loft hatch is not quite square, because the joists were not parallel!
  • The new extension is not exactly as intended - the roof is higher, the chimney lower and the plasterer gave me incorrect answers to two clear questions, with the result that the internal work I did is not perfect; one window cill has thicker render than he said, so it's almost level with the top of the lower window frame, and a plastered stud wall is thinner than the rendered blocks that it rests on.
Looking at the good side, there are lots of things which make me smile:
  • The stone wall where I filled in the bottom of the old doorway
  • The wall which I lime-plastered myself (the stone wall which is the join between the old house and new-build extension)
  • The new 6' stone wall beside the front door, and the attached gates
  • The new sash window which cost just £95 from a reclamation yard
  • The front room floor where I replaced bits of joists and re-laid most of the boards plus some reclaimed ones
  • The stud wardrobe frontage which I built for the master bedroom
  • The wood-burning stove in the kitchen, in the alcove which I "found" by removing the old tiled fireplace
  • The recently fitted secondary glazing (we are cosy, and it is quieter now)
  • The limecrete/black limestone floor in the kitchen (laid by Chris, Shane and me)
  • The black limestone floor in the new extension which I laid entirely by myself (on concrete...)
  • The extension roof on which I laid over half the slates in just over a day on my own, much to Chris's surprise
  • The casement window in the new extension which I salvaged from the old extension and did a major repair job
  • The 1800+ Imperial bricks from the old extension which Jane and I salvaged and were re-used in the new extension (I only had to buy about 200 more)
  • All the other little bits and pieces from the old building which I laboriously removed, kept and re-used
  • Buying my own mixer, instead of hiring one
  • Deciding that I would manage the entire process myself, instead of paying a builder to project manage it
Actually, the whole place makes me smile - it just feels so safe, solid and secure, just as a home should feel.

Thursday, 18 October 2012

O Wall! O Sweet, O Lovely Wall!

The wall is complete! (Apart from a few details... )

Many people better educated than myself might recognise the above quote from "A Midsummer Night's Dream".  You might think that this would be the most appropriate quotation for me (despite my failure in English Literature 'O' Level!), as I savour my hard-won success.  However, given the way I feel right now, a rather more appropriate quotation is found just a few lines further on in the same opus: "O Wall! Full often hast thou heard my moans"!

I sit here feeling very tired after a long and hectic day's work.  I had finished off the stone structure on Tuesday and today was the icing on the cake, or rather the copers on the wall. I'm quite surprised that I have built most of the structure using stone that was already at the property; all I needed to acquire was the faced stone (including the pintle blocks for the gate hinges) which forms the quoin.  I was pleased that it was pretty level for the coping stones to be laid, and also when I made a small framework to lie on the top I proved that it was pretty well parallel as well.  I used this to draw a line showing the width of the coping stones and, hence, where I needed to grind an angle on the (few) protruding bits.  There is a bend in the wall - I didn't want to make this too easy for myself! - and of course I had forgotten about the coping stones when I designed the bend.  This bend was required because I didn't want to uproot the ivy climbing up the boundary wall, which would have been necessary if the new wall had been straight.  Another difficulty was that the soil rises in the direction of the boundary wall, so the foundations required a lot of thought.

Today I hired an angle grinder again [Top Tip: buy your own blade if you think you'll hire one more than once] and spent the morning cutting and grinding in preparation for the afternoon when my son arrived (with grandson) to help with the difficult bit - lifting the copers carefully into position on their mortar bed.  Since the heaviest weighs about 45kg, you can imagine that I had quickly decided that this was too much for me. I made a mix of NHL (sharp sand: building sand: NHL3.5 in 5:1:2 ratio).  This is basically standard 3:1 but I added the local building sand which gives a good colour match to the house pointing.  My grandson loved the mixer but was otherwise confined indoors as I had to wield the grinder again to make the last coping stones fit. 

However, in my haste I made too much mortar and so after my son left I spent the next three hours doing pointing and minor repairs to use it up; I gave up when it started to rain as dusk was falling.

I'm pretty pleased with the result.  A lot of thought has gone into this wall; I find that things usually turn out better if you think long and hard before you start, and try to imagine exactly how things will be done and what problems might ensue.  (There have also been a few sleepless nights.)  My vision was to build a security wall which would look as though it had been there for years, and I'd like to think that I have succeeded.  However, I'm glad I'm not doing that for a living - I started in May and thought it would be done by early July!



Friday, 28 September 2012

Feeling Old

So is this the feeling of getting old?  Creaking joints, tired muscles, strained ligaments and that internal voice which keeps asking "should I be doing this at my age?", not to mention a general lack of energy and motivation.  I've always known and recognised my physical limits (not to mention legal and financial!), but suddenly there are many new ones coming into play; it's as though there is a Sgt Wilson inside me saying "Sir, are you sure that's wise?".  Drat, he's often correct.

I've done a fair bit on the front wall since last week despite the weather; but I've come to a stop due to simple tiredness.  Those at a similar age will perhaps recognise the signs of not sleeping particularly well or, if you do sleep well, still feeling tired the next day.  I tend to sleep well for a period which might be five or six hours if I'm lucky, but could be just two or three if some drunken berk wakes me up; thereafter, getting back to sleep may be difficult.  [Our house seems to be on one of the few ways that connect two parts of the town, and there are some (I'm sure it's the same people) who seem to love shouting in friendly terms at each other as they wander back home at 1am, 2am or even 3.30am.  Since the house is Grade II listed, I cannot fit double glazing to the bedroom windows but I do have secondary glazing on my immediate to-do list.]

Last week I enlisted the help of my son to lay a large flagstone on top of the wall, to be under the end piece of coping stone.  I could just manhandle this piece of stone on the ground but he picked it up on his own (with some effort, I think) and it was a joint job to get it to the top safely.  It went on surprisingly easily as for once all my measurements were correct, the cutting of the stone was spot on and also the mortar bed was perfect first time.  This was needed as the 14" coping stones are all narrower than the wall at the gate end, and so the flagstone also has bevelled edges to help with rainwater flow.  The 18" width of the wall at the gate end was governed by the size of the two 24" x 18" x 6" pintle stones which I purchased last year, and there was no way that I was going to cut them!  I have carefully made the rest of the wall narrower so only the end two feet needed this treatment.

Yesterday I did a lot of work on the wall, including lifting the first coping stone in place six feet up onto the bevelled flagstone (photo coming [Edit: I'm not posting the photo as the wall looks quite silly with just the one piece of coping stone! It's all out of proportion]), so I'm getting there. However, the coping stone was heavier than I realised and I could have done with the assistance of my son again.  The weight was bad enough - it must be about 35-40kg which itself made my knees creak - but then positioning it on the wall was quite difficult due to the shape; I could easily have damaged my back as I leant forward with it but chose instead to rest it on the mortar bed which then had to be re-spread.  Hence, last night I was particularly tired and slept through over eight hours without stirring (a rare occurrence) until woken by t'other half putting the radio on. This morning I can hardly get going at all, and there is no way that I will do more than potter around doing bits of small jobs.

After laying the first coping stone on top of the wall, one old song from The Jungle Book keeps coming into my mind - Kenny Ball singing "I'm the King of the Swingers".  This contains the memorable line "I've reached the top and had to stop and that's what's bothering me."  Unlike him, it's not bothering me and I shall be delighted when it's all done!

[Edit: I'm advised that actually Kenny Ball's version of "I'm the King of the Swingers" was a cover, following the film.]


Monday, 17 September 2012

Stone Walls Do Not A Prison Make...

...but it certainly feels that I am trapped by the need to at least get the front side wall and back gate done before winter sets in.  There has been progress on the walls and so an update is merited.  

The front wall is almost there.  I really want to get this done to full height finished with coping stone and pointing before I remove the horrible fence panels.  These are what everyone sees when walking by, and I don't want to draw attention to my wall by being seen to be working on it for so long.  I just want to unveil it and see how many people notice it.  My hope is that relatively few will actually notice it as the plan is for it to look as though it's been there for ages.

On the left is the view from the house side (obviously I can't take a picture from the street side as the fence panels are in the way).  There is only the coping stone to add at the left hand end.  Try counting the number of stones in this wall, and then think about how long it has taken me, given that on a good day I might select and lay just ten stones in four hours if I'm going well.  Then I'm shattered and can't do any more for a couple of days...

Also visible in the picture above are the hinges for the right hand gate, plus three bits of batten to make a frame.  This was done to prove that the pintles were in line, and to allow me to position the hinges on the uninstalled gate with reference to the other gate.  (NB The vertical battens are not parallel as the holes in the hinges are not identically spaced, which surprised me.) When the gate is fitted I shall only have to sort out its locking and latching and then I shall have some security for the first time.  It will also keep the various neighbourhood cats out; they seem to still regard this place as their hunting ground, but we like looking at the variety of birds!

The retaining wall (of the "upper terrace"!) has been extended and so now runs from the back wall alongside the house, past the extension and as far as the kitchen - that's about 12 yards.  I've been using the damaged Imperial bricks in this - why use good ones?  Here's a current photo showing the end of the wall and the steps up the earth bank (with the top step which has been added since the last post):

This photo clearly shows the difference in ground levels since I decided to make sure that rising ground would never again cause dampness here.  The house is just six feet from the bottom of the steps and the original ground level at the base of the house was just above the level of the bottom concrete step.  The temporary wooden board at the bottom of the steps is about 2cm below the final new ground level.

I cannot do the stone facing for this wall yet as that job will use up the remaining stone when everything else is done.  When other walls are done, I will choose enough decent bits to cover the brick and facing stone along the top of this one, and only then will I be able to do the face with small bits.  Obviously I don't want to break up larger stone yet as I need a good choice for the other jobs.


Wednesday, 8 August 2012

Front Lawn and Driveway

After all that's been done on this house in less than two years, you wouldn't think that I could have a problem over something as simple as cutting the grass.  The problem is storage - there is nowhere to keep a lawnmower, so until there is I don't want to buy one.  I used to have a sickle (inherited with the property) which kept things under control last year but somewhere this has been lost; I think I hid it so that my grandson could not hurt himself (or us!) with it, and now I cannot find it.  This was useful at keeping the weeds down, but is a bit labour intensive really.  Slowly this year the grass has grown to represent a moderate hay crop in some places; since the lawn I seeded in March has grown wonderfully, I'm puzzled as to why the old lawn has grown so slowly. 

Anyway, the solution was quite simple in the end - I borrowed my son's mower! This seems a small payment for the babysitting that I do (even though I do enjoy looking after my grandson).  His lawn is less than half the size of mine, so the mower had a good workout.

Of course, having done that task and made it look very nice indeed, only a day later Colin, my friendly groundworker, came and drove his digger over it.  Reason? At last my neighbour is having his driveway done, so very soon he will be able to enter the front garden through his own gateway and park on his own drive for the first time. On the right is a shot of the work in progress, with the mown lawn being abused and the first pile of three being prepared for the grab lorry.

The photo below shows the almost finished task, which has a lot more driveway than mine.  The old gap in the wall is on the left; I had my eye on the stone from the new gap but sadly his part of the front wall had been rebuilt at some time in the recent past using C*M*NT mortar, so it took a pneumatic drill to prise it all apart.  [I'm sorry that I just cannot bring myself to spell the C-word with regard to its use on period property.]  The result is that many of the stones are broken and unusable.  In comparison, my bit of wall came apart very easily last year - see this previous entry.  I'm not sure that it had any mortar at all apart from some recent c*m*nt pointing which was not very deep (or useful, of course).

There was a small problem yesterday when one of Colin's workers pierced the neighbour's water supply with the pneumatic drill - I think Colin was quite embarrassed by that! Fortunately it was on the right side of the meter only 18" away, and a groundworker has all the necessary bits and knowledge to fix that very quickly; no harm done.

Monday, 16 July 2012

Limestone Walling for Beginners

The wall beside the front gates progresses slowly.  This is not really because of the poor weather, as I have done a lot of work on it in this last week by second guessing the weather forecast.  The lack of speed is simply because building a proper stone wall is a laborious task which cannot easily be done more quickly, especially by an amateur such as me.  The new wall is hidden behind this fence panel (photo right) to the left of the front door, and extends to the boundary wall on the extreme left.

Before finalizing the design of this wall I did a fair bit of research to see what sorts of wall could be described as the local style.  Although this was interesting, I actually got confused as there were so many slightly different styles which I had never noticed until I took fifty pictures of various local walls!  I therefore settled on the obvious idea of making it the same design as the boundary wall that it meets, although I am adding on the top some coping stone which was removed from the front wall where I put in the driveway (see photo at the bottom).  The end of the wall has to be 17" wide as that is the width of the reclaimed cut stones with pintles for gate hinges (which I bought last year), and the lower one can be seen in place in the photo left.  As the coping stones which I have are 14" wide, the wall will have to narrow slightly both as it rises and as it goes further away from the hinge line. It also has a slight bend in it, which is why the courses look odd in the photo left (NB It is about 27" high here and still needs pointing).  The finished wall will be about 6 ft high at the end for the gate hinges (i.e. the left hand end in the photo), and about 8 ft long, so that I will have a pair of gates beside the front door, and then the wall will extend across to the external garden wall.  The soil rises as you get closer to the garden wall, so the height above ground will be only about 4 ft at that end; to aid security, I will plant blackberries which are growing freely here - they are really nasty so will be quite an effective deterrent.

I am using a 3:1 mix of sharp sand and Castle NHL5 plus a small amount of building sand for the mortar of the main structure; possibly I could have used NHL3.5, but I wasn't sure so went for the "eminently hydraulic" NHL5 (see the Mike Wye website for explanations!).  For pointing I shall use a 3:1 mix which I have already tested and made up, using local sharp sand and lime putty as this will give me a good match with colour seen locally.  I think I read somewhere that it helps a wall if the outermost mortar is more porous than the internal mortar.

Technically I am repairing the wall, as I found the old foundations of a brick wall whilst digging the foundations for this one.  I am embarrassed to admit that the foundation is comprised of concrete blocks as I want this wall to be solid and to outlast me.  I know that lots of old walls stay standing for umpteen years but I bet that the people who put those up had a lot more skill than me! 

It might not be obvious but it is essential that limestone is laid in the correct orientation: the strata in the stone must be horizontal, as this is how the sedimentary stone was formed; if you lay it on its side then the strength is reduced significantly and it might well split.  It helps a lot if you can lay each course using stones of a uniform thickness, and you should also try to use the thicker stones at the bottom of the wall (but that might just be to save lifting heavy stones up high!).  The shape of the stone is clearly important as well; I am building a wall of squared faced limestone by re-using old stones which are already essentially in the shape of blocks.  You can do a wall using rubble, which sounds terrible but means that the blocks are not squared and you probably have to use the natural face caused when the stone is split.  Even then, you still want to build it in courses, but they can go up and down gently with a varying thickness, rather than being in neat horizontal lines.

I am trying to make the wall look as though it has been there for ages by using weathered stone which looks grey rather than yellow, and the source of a lot of this was the driveway cut through a low wall (the right hand gap in the photo, right).  However, that only gave about 20 sq ft of stone, and I probably need 50-60 sq ft.  I have also got some various bits of stone which were lying around this property, plus some yellow stone from under the kitchen floor, plus some more grey bits found when digging the foundations for the extension.  More recently I had some good fortune when the digging of a soakaway in the churchyard two weeks ago yielded another 5 sq ft of lovely squared blocks which have dried out and look very good.  [Top tip: sodden limestone and bricks dry out very well if you remove all the earth and mortar, leave them outside (raised off the ground on some old batten) and brush it periodically with a stiff hand brush.]

One obvious reason for the poor rate of completion is that my own skills are limited - after all, like many other tasks on this house, I have never done this before.  Although I have a good idea of how it should be done, there is no substitute for experience.  Another reason is that the supply of stone is limited (and the stone has been spread over a good area of the intended lawn), which means that the choice of each stone is quite time-consuming, but pre-sorting the stone by thickness helps speed things up.  I try to choose all the stones for several feet of a single course before mortaring them all in as that seems to speed things up as well.  I do actually find the job quite satisfying; this is possibly due to my mathematical bent and my liking for jigsaws.  I also used to play Tetris and am good at packing the car for going camping.

My final reason for the slow progress is that it is very tiring work.  My elbows feel strained and I have been sleeping very well recently.  Hopefully I can make more progress in the next week or two, and I'll post details when I unveil the wall to the public!

Tuesday, 10 July 2012

Walls, Weather and the Olympic Torch

Since I last posted more than two weeks ago, I really have been trying to stop getting annoyed with the weather and just get on with the various walls which I need to build.  However, I have to report, just in case it's not obvious or you're lucky enough to not have been in the UK recently, that progress on walls has been frustratingly slow because since then I've only done about three days work thanks to our "summer".

One achievement is that I have done a good bit of work on the second wall end in the front gateway of the driveway.  This was an essential precursor to doing the main wall beside the house as it needed to have first choice of the available stone in order to match the rest of the wall.  It isn't finished or perfect but I am quite satisfied with it.  Its public position means that it gets more attention than I might like and it will still need more work such as setting the coping stone.  The weather has been so bad that I've not even taken a photo yet, but will do so soon.

Such is the rarity of decent weather that I recently had to choose between using a fine day to maximum benefit by doing more walling or going and see the Olympic torch which passed nearby.  In fact, we were living in London not far from Tower Bridge when the Olympics were "won" in 2005 and we decided then that it would be a good idea to have moved out of London before the event happened.  Somehow one knows that the public disruption will be quite intolerable for those residents who have a reasonable desire to actually work almost as normal.  You won't be surprised that such is my level of enthusiasm for the Olympics that the wall won and I spent a productive and tiring afternoon doing half a course of the wall beside the front door.   

OK, yes the Olympic torch passing is a once in a lifetime event, but there are many other things I wish that I had done in my life, and I have learned to have few regrets.  One thing that I do still regret was when Concorde was returned to service (in 2002 I think) after the Paris accident; passenger numbers were low so they were offering a day trip to New York (with one way on Concorde) for £1,000 but, even though I could have afforded it, I persuaded myself that there would be other opportunities.  Of course, when they suddenly pulled the plug less than two years later, there were no good deals then!

Finally, I should record the first anniversary of our actual move into this property.  This causes me firstly to ask where the year has actually gone?  There still seems so much to do and, as far as I am concerned, relatively little seems to have been accomplished of what I expected to do (but when I say this, Jane says that I shouldn't be so hard on myself).  I know I can't blame it all on the weather.  Once you are actually living in your house, the priorities all change and I have deliberately told myself that I am retired so what is the hurry?  I still refuse to have a huge list of tasks as that would be too depressing, but I do try to decide at the start of each week exactly what I'd like to achieve in that week; however, that brings me back to the vagaries of the current weather...

Sunday, 24 June 2012

Walls and Weather

Well, I could go on about the recent weather, but you know what it's been like.  What I find really annoying is when the forecast is for weather which is a lot worse than the actual.  This can really mess up one's plans for the day, when you want to work outside, using cement or lime.  You find the day is unexpectedly sunny when frequent heavy showers are promised; yet when you check the current forecast on the BBC for your own specific local area, you find that it's still showing heavy showers.  So what will happen in the next couple of hours? Do you dare risk it?  I think that they are covering themselves with that symbol of a black cloud with raindrops and sunshine; basically they haven't a clue!

I have managed to out-guess the forecasters a couple of times.  I have started the garden wall foundation (parallel to the western wall of the house, about six feet away, holding back the higher ground) and have done the foundation and the first real bit of wall on the wall beside the front door.  There's also a new bit of concrete where the wheelie-bins will be stored.  Sadly, this is now the height of summer and I have barely started the major outside jobs that I had been "looking forward" to doing; apart from the walls and concrete leading to the patio area, there are a large number of sash windows which need refurbishment while it's warm (if/when?).

I've also done the promised run to the scrap merchant; the brass was £2/kilo (not bad...) but the ferrous stuff was down to 11 pence/kilo which was a bit disappointing considering I took 246 kilos in my car!  When he weighed it, the scale said 445 kg which almost excited me, but that weight was because it had all been put in a large (and heavy) metal stillage.  At least there is now a bit more room in the garden as I've also done a run to the council tip this week.

I mentioned (here) about the limecrete floor being laid in the church opposite; here's a photo of the finished floor.  This is just the choir vestry, where there was extensive damp, rotten floor joists and horrible smell!  The stone is Creeton Silver edged with Creeton Blue limestone (from Ancaster, I think).  Before you ask, no, I don't know why honey coloured stone is called "silver".  There's now a French drain and new soakaway being done outside in the churchyard, as well as re-pointing and leadwork.

It's all expensive but it's the necessary long-term solution to ensure the structural integrity of a Grade I listed building which will still be here long after I've gone. Once again, I'm reminded of the proverb "a stitch in time saves nine".  This is so true of old buildings - if you don't look after them properly then one day you (or your successors) will have to repair the unnecessary damage and pay out many times what you saved in skimpy maintenance.

Friday, 8 June 2012

Rain, Rain, Rain

I asked the other week why we British always talk about the weather.  Well, after the rain of the last week I think I can now answer the question - it's because the weather is so b****y awful.  April and May were bad enough but I think we all thought that the heatwave at the end of May heralded the start of summer.  Wrong!  I have managed to get a small amount of work done outside, but nowhere near as much as I had hoped.  Right now the rain has eased but it's all muddy underfoot in my garden builder's yard and everywhere is dripping.

What I have achieved is to make a deep concrete plinth (right) on which to mount a cast iron lamp-post, and I've laid a concrete foundation for the wall beside the back gate, together with some block work where the wall itself will be buried in the slope of the garden (no point in burying good faced limestone!).  Although they seem small, these two structures together consumed a whole one tonne bag of ballast!  There is just the small matter of the wall itself to be built, plus 14 yards of foundation and retaining wall for the garden beside the house.

Mind you, I have been very busy on other things in the last ten days.  We had a church 1950's party which had to be held inside as it was so cold (quite apart from the occasional shower) and we've spent some time looking after our dear 17 month grandson.  Firstly we took him (without his parents) to a large family do in London where the sheer numbers could have fazed him, but he survived remarkably well and we returned home as proud grandparents (although we also acknowledge our age and consequent tiredness).  Then we looked after him for a whole day at our house, when he was cheerful, fun and communicative (and we got even more tired!).  He has reached a reasoning point, where he can work out a problem for himself.  For instance, he has been known to push a chair to the kitchen work top so that he can climb up onto the work top!  The other day he stood near our front door and then at me and asked to be picked up.  It then became obvious that he only wanted to be higher so that he (or I) could open the front door as he knew the latch was well out of his reach.

I have also recently received direct from the publishers a copy of a new Haynes Manual called "Period Property - care and repair of old houses".  This was especially good because it was free: it contains some photos of the limecrete floor in this house.  Then the author, Ian Rock, came to see this house as he was so interested by this blog and wanted to see what had been done to the house. [Edit - they now have a website http://www.period-house.com/]

Friday, 1 June 2012

A Genuine Jersey Holiday

It has been a bit quiet here recently.  This is partly due to a general malaise on my part, partly because I have been doing odd little jobs which aren't worth reporting, and most importantly because we have just had a week's holiday in Jersey.  This was our first overseas holiday in almost four years, so it was about time!

Jersey is interesting.  Many buildings are made of granite, and they seem to care more than my local council about the old look of the place, especially away from St Helier.  In consequence, there was a lot of work being done by local builders using granite, although I suspect not with lime mortar.  Actually, since granite is (I think) not porous like limestone, I'm not even sure if lime mortar is as necessary as it is with limestone.  There was also a significant amount of concrete work in evidence, much of it dating from the German occupation in WWII.  They used slave labour to fortify the place against an Allied invasion which must have been a huge drain on their resources; however this was totally wasted as the Allies had not the slightest intention of invading the islands.  One of the still useful legacies is a high sea wall (built to prevent tanks being landed) which goes all the way along the five mile beach at the west of the island.

If you are thinking of going to Jersey (as a tourist rather than occupier!!), I advise you not to go in July or August if you want to drive around.  The roads are small, junctions have poor visibility and parking can be difficult.  I think that the roads and junctions are deliberately never improved as the maximum speed limit is 40mph (and can often be 30 or 20!) and so the road design is effectively a cheap means to regulate traffic; if you have an accident at those speeds, it is probably rare to even injure someone.  The road signs leave something to be desired; they seem to fall between UK and French standards, so often a junction is signed in advance but not at the junction itself.  The parking would have been tiresome in the peak times, but we were able to park quite easily, even in St Helier.  These things were not really a problem in May, but we kept on asking ourselves "what would this be like in August?".

Our visit occurred during the Jersey Food Festival; we spent the only really wet afternoon in a posh hotel watching and tasting cookery demonstrations (and I tasted my first oyster).  A simple food I now love is the boiled Jersey Royal potato - delicious with butter.

One place we visited was Jersey Dairy Ltd - see photo of their new factory right.  They are effectively the only exporter of dairy products from the island.  (My thanks to Eamonn the MD for the tour, the free ice-cream tasting was great!)  One little-known fact is that under current rules the Channel Islands are not protected by labelling regulations, and so if you have a single half breed Jersey cow in your herd anywhere in the UK, you can sell all your milk as "Channel Island milk" or "Jersey milk".  Apparently most supermarkets use this ploy on lots of dairy products to confuse consumers, which seems a bit underhand but is quite legal.  To avoid it you should look for a little logo which says "Genuine Jersey" (and I think there's an equivalent for Guernsey); this logo IS protected and means what it says.  The Jersey cows on the island are registered and protected in order to maintain the purity of the breed, unlike on the mainland here.

By the way, we also visited a farm: the Jersey cows are ever so sweet and friendly!

Saturday, 12 May 2012

Why do the British always talk about the weather?

It's a British stereotype, isn't it?  Put a group of Brits in any social setting and the standard way to break the ice is to start a conversation about the weather.  Being British, the odds are that the conversation will not actually progress much past the weather.  If the group were French, American, Israeli or African, the odds are that you wouldn't leave until you had shared your life stories and been invited to stay should you ever pass near their home.  (I met a couple from Hawaii recently who gave me their card and said that I must drop by if I ever go to Hawaii!  Being Americans, I reckon they meant it, but I doubt that I will take them up on it.)  But we just talk about the weather.  Nice day, isn't it?  Hasn't it rained a lot recently?  Last night was a bit parky.  What's the forecast for tomorrow?

I think a lot of it is that we are just not used to sharing personal information verbally.  This seems odd, considering that most people seem to be happy to share all sorts of stuff with complete strangers on the internet (which I personally reckon is pretty unwise).  The weather is always unpredictable and seems a safe topic of conversation; when I was younger we were not allowed at family mealtimes to talk about cars, work, school, sport, religion or politics, which pretty well left the weather as the only topic!

So why am I writing about talking about the weather?  Well, I have lots of work that I'd like to do outside and haven't been able to because of the weather we've been having.  Right now I have stone walls to build, concrete and paving slabs to lay, plaster to mix (for inside) and things to sand and paint.  I can't really even tidy up the extension as most of it has to go in the shed which is on the far side of a sea of mud (which is where a lawn might be next year).  I made a start yesterday (Friday) by finishing one end of my low wall beside the drive and starting the foundations for the wall beside the front door, but there's a long way to go.

I now realise just how good the weather was last year, as I was able to take my pick of jobs according to priority, not according to the weather, and could do lots of messy jobs like sanding doors outside in the sun.  The only good side of it is that the grass seed which I sowed in hope during March has come up well - the irony is that I decided not to lay turf as I thought that the hosepipe ban would mean that it would dry up...

Thursday, 15 March 2012

Stone Walling - Cotswold Style - Part 1

Wherever in the country you find dry stone walls, there is always a distinct local style - or perhaps even more than one.  The Cotswolds are no exception, and the above photo shows what I believe is the typical local style, with almost rectangular stones in neat lines with vertical coping stones on top - these are set with mortar but that's not always the case.  An alternative form of coping is simply some rounded mortar (photo right).  If the wall is being made using mortar instead of being dry, then the stones are naturally not needed to be so rectangular as the mortar makes good the irregularities, and the lines of stone are not always so even (lower photo right).



Of course, as I'm not actually in the real Cotswolds, the local stone is not exactly the same and so things tend to be just that little bit different here.  This preamble is my excuse in advance for the odd appearance of whatever I build, as I have the need of doing several stone walls soon.

I have actually made a start this week on my own first simple dry stone wall. This wall is to be about 15" high just to give a clear edge to hold back the raised ground where we lowered the surface to make the drive level (photo below).  Thus only one side is visible and the back of the wall is built into the earth bank.  I already had the foundation which is Celcon blocks laid flat, set on cement; this was done last year when we did the drive, to form a solid edge to the "self-compacting gravel" which we laid as the drive surface (and I'm very impressed by it, by the way).

I'm pretty happy with the progress so far, although it is quite surprising how much stone is required for even a small wall.  This low wall is also a low risk opportunity to see just how difficult this task is as, if it all goes wrong, I can take it down and try again without a great waste of effort or loss of face! 

When I feel competent, I shall progress to a very long wall going alongside the house, to hold back the (higher) garden as mentioned at the end of a recent post (see here), plus a high but fairly short wall beside the front of the house, to incorporate some lovely stones with pintles (which I bought last year) so that I can hang a gate - the other gate will be attached to a post on the side of the house.  The final job is to repair the wall ends where I cut the opening for the driveway.  In my favourite reclamation yard, I found and purchased a large old coping stone which was from the wall outside the local Methodist church.  This lovely piece of limestone was cut in two last June and I think they will look perfect, giving a square end to each wall - see photo of one of them, right, with the newly bevelled edge away from the camera.  However, since that job requires lime mortar, it can't be done until I am sure there will be no more frost; also, it's rather publicly visible so I hesitate to start with that job!