The garden to the west and north of my house is still technically not a garden but a builder's yard. I made some progress with walls etc in last year's dismal apology for a summer, but I really want to get some major fine weather jobs done. These include stone facing on a long retaining wall, 10 m of setts laid, 25 sq m of limestone pavers, a fair bit of earth removal, clearing the rubble from the "lawn", planting the new lawn, painting 16 m of picture rail for the lounge and refurbishing some of the 7 sash windows. (Recently I turned a window cleaner away on the grounds that the state of the windows meant that he would be likely to damage them!) Even recently I have been too busy with accounts to do much so the garden has been quiet for the entire winter.
However, all these best laid plans really have "gang agley". I have an operation provisionally booked for May 1st, and so whatever is not done in the next six weeks will not get done until July or August.
I have been running a blog about this potential operation which you might care to visit: http://diaryofakidneydonor.blogspot.co.uk/. If you know of any one who has done something similar then please point them to it - I'd love to have details of people's recent experiences of this. One thing that surprises me is that the whole thing now is VERY
emotional - I can hardly talk or write about it without welling up. I
think this can only increase!
I'm glad I never actually set a completion date; we set (and met) the
"move-in" date in July 2011, but thereafter it's just one task after
another. 'Er indoors is very patient!!
This is the story of the purchase and renovation of Matthew & Jane's house somewhere in the heart of England, following Matthew’s redundancy in 2010 at the age of 58. Said to be from c.1835, we first saw it in Aug 2010. It had been empty for only a few weeks but was pretty awful due to dampness and long term neglect. Locals thought it had been uninhabited for years and was only fit for demolition! But we bought it anyway and moved in after 8 months work in July 2011.
Friday, 15 March 2013
Thursday, 21 February 2013
Ze Flashing Lights!
Those of more mature years will remember the wonderful spoof TV comedy series "Allo! Allo!" from thirty odd years ago - I'm sure it's still shown on some Freeview channel somewhere (or else BBC will show it when they finish "Dad's Army" again). It was all silliness about a cafe owner who was reluctantly involved with the French Resistance in WW2, in case you're wondering. One of their running jokes was how the knobs on the elderly mother's bed flashed when "London" was calling "Night'awk"on the radio.
Why am I telling you this? Well, we have experienced the same sort of flashing lights over some period of time. The problem was usually associated with high winds (in my trees) and so it seemed to me to be something to do with the above ground cables which supply the mains electricity to all the houses here. The supply to our house is via a cable hung from the terraced house
on one side, through the trees
to the corner at the front left; there it splits and our feed goes left
around the fascia while the feed for next door routes to the right
along our
fascia (old photo right; the cable is not visible but goes from the top left corner of the picture to a point above my head, level with the gutter). I was misled by the same symptom happening to other people
locally which
caused me to believe that it was affecting a good number of houses. When we moved in I had some interesting times with the electricity supply (which I mentioned in this entry) as the old cable was perished and totally covered by the ivy. Although it took a fair few phone calls, the job did get done properly and so I thought it was unlikely that the flashing issue was with my end of the cable.
However, I got fed up with the flashing in the high winds a couple of weeks ago - it wasn't just the flashing, but the fact that it tripped our answerphone which then reset itself saying "Answer on; calls will be answered in five rings". When the power dip is repetitive, you hear "Answer on - Answer on - Ans - Answer -Ans" etc which is really annoying when you know you are alone in the house. Curiously the power issue only seemed to affect the phone. No digital clocks reset themselves and there was no other symptom, until the day when (unusually) I had the digital radio on and it all went garbled for some time; it only came good when I switched it off and on. Then later the same day it went off entirely for over a minute and I decided this was too much so called the electricity supplier. Of course, I got cut off once making that call by the answerphone resetting itself! Aaaaagh!
Anyway, at last the problem was reported and they promptly came with the emergency team. To my surprise they reckoned there was indeed a problem with the new connection - it had overheated (WHY?) and melted the plastic sheathing. Worryingly, they said that it did happen sometimes even with new bits (but I'm a Chartered Engineer and I like to know WHY!). It's been replaced now and the problem has not recurred, so tranquility rules again.
Why am I telling you this? Well, we have experienced the same sort of flashing lights over some period of time. The problem was usually associated with high winds (in my trees) and so it seemed to me to be something to do with the above ground cables which supply the mains electricity to all the houses here. The supply to our house is via a cable hung from the terraced house
on one side, through the trees
to the corner at the front left; there it splits and our feed goes left
around the fascia while the feed for next door routes to the right
along our
fascia (old photo right; the cable is not visible but goes from the top left corner of the picture to a point above my head, level with the gutter). I was misled by the same symptom happening to other people
locally which
caused me to believe that it was affecting a good number of houses. When we moved in I had some interesting times with the electricity supply (which I mentioned in this entry) as the old cable was perished and totally covered by the ivy. Although it took a fair few phone calls, the job did get done properly and so I thought it was unlikely that the flashing issue was with my end of the cable.However, I got fed up with the flashing in the high winds a couple of weeks ago - it wasn't just the flashing, but the fact that it tripped our answerphone which then reset itself saying "Answer on; calls will be answered in five rings". When the power dip is repetitive, you hear "Answer on - Answer on - Ans - Answer -Ans" etc which is really annoying when you know you are alone in the house. Curiously the power issue only seemed to affect the phone. No digital clocks reset themselves and there was no other symptom, until the day when (unusually) I had the digital radio on and it all went garbled for some time; it only came good when I switched it off and on. Then later the same day it went off entirely for over a minute and I decided this was too much so called the electricity supplier. Of course, I got cut off once making that call by the answerphone resetting itself! Aaaaagh!
Anyway, at last the problem was reported and they promptly came with the emergency team. To my surprise they reckoned there was indeed a problem with the new connection - it had overheated (WHY?) and melted the plastic sheathing. Worryingly, they said that it did happen sometimes even with new bits (but I'm a Chartered Engineer and I like to know WHY!). It's been replaced now and the problem has not recurred, so tranquility rules again.
Friday, 1 February 2013
The Saga of the Water Meter
In almost every decision on restoring this house, I deliberately tended to adopt the long term solution. After all, we expect to be living here for a fair while, so the more expensive long term solutions were always worth considering as we would derive the benefit. One such was the sheepswool loft insulation (see this page); this was quite expensive but it allows the ceilings to breathe, and is so much nicer to work with than the glass stuff which irritates. Another has been the acrylic secondary glazing (see this page), which has made the house so much more comfortable, and in any case will have paid for itself in two years or less. Other investments are purely financial, based on the expectation that we will still own the house in ten or more years' time; one such item was the water meter. We had one in our rented house in 2010, and the experience was that, with just two of us living there, the meter had saved us about £150 per year. So it was a no-brainer to have one fitted here and, quite naturally, I wanted it done early in the restoration.
I had identified that the mains supply for the house had a stop cock under a plastic cover in the pavement; there were two stop cocks inside the house; the main one was in the hall and fed a flexible (washing machine quality?) pipe which went to the bathroom above and had supplied the cold tank (which had already been removed to the garden!). The other supply went to the old extension, and I had had the plumber fit a new internal tap so that we could properly attach a hose for the plastering and floor laying. When that was working I had the plumber feed the other supply through to the kitchen so that it was ready there, but out of the way of planned work.
So, early in 2011 I made an application to Thames Water for a meter. They sent out a workman (actually a contractor) who looked at everything and asked me if I wanted an internal or external meter. I said "external if possible", not wanting to have a meter getting in the way of the kitchen floor and plaster work about to be tackled. Little did I know. A crew was sent without delay, and they very speedily fitted a meter under the pavement. OK so far!
There was an amusing small glitch later in the year - when doing the extension we found that the water supply in the old extension actually carried on under the brick wall separating our back gardens and fed our neighbour's outside tap. This would not normally be a concern, but in fact it had been used as the sole supply for the construction of a £3 million building at the back; this was an arrangement which preceded the sale of next door, and when they purchased it, the builders had an obligation to pay his water bill for a period. As it happens, the construction had been completed about two months before I asked for the meter, which was fortuitous. My neighbour admitted that he had been puzzled that his water bill was completely normal!
Having moved in (July 2011), I had a very low bill the next month, followed in February 2012 by a quite reasonable one of £91 for a six month period. You can imagine my consternation when in August 2012 I received my second six month bill for £274. Now, the house next door (not our other half but a separate cottage) had been rented out from February 2012, having been empty for over a year; it was not difficult to do a quick bit of detective work and spot that there was no other water main cover in the pavement for 15 metres, and so clearly they had fitted the meter to a shared supply. D'oh!
I can write this now in the cool light of reflection of the last five months. That time was regularly punctuated with me telephoning Thames Water and getting not much satisfaction. It took a considerable amount of persistence to resolve this issue, and their first level help desk staff became predictable in their complete lack of ability to achieve anything. Their typical response was to say that someone would call in 6 working days but nothing happened. One really stupid thing that someone did was to rescind all their bills back to when the meter was fitted (although the meter readings WERE valid and acceptable to me for almost a year), and then send out a bill for the standard rate for April 2011 to April 2013, so that I owed them £789, payable at once!
If you have the same sort of issue, my top tip is that at the first excuse you say the magic words "I want to escalate this issue". Once I had been passed on to the "Escalation Department" I had much better service and progress was made, ultimately successfully. Sadly for me that did not happen until I had wasted nine weeks and many phone calls in trying. A second top tip is to keep a good record of your phone calls; it really gets the attention of the Manager in the "Escalation Department" when you can name the idiot who failed to do what he promised four months ago, and when you give a string of names and dates they quickly realize that you do indeed have a point. The other thing to remember is that it is (usually) not the fault of the person to whom you are speaking, but one of their colleagues, so a plaintive sob story with a hint of desperation gets a far better response than shouting at the poor unfortunate one who was unlucky enough to get your call.
The result for me was that in order to have a meter it had to be internal. Of course, this would have been much easier if it had been done before installing our new kitchen (June 2011), so there was a bit of an issue as to where to put it. The only sensible place was under the sink, and Thames Water said that their installer needed six inches "all the way around" to fit the meter. Now, it is natural to fit pipes within two inches of the wall and floor, isn't it? This is what my plumber had done, and they wanted me to sort out the pipes before they would send someone to fit the meter. I rather griped at that generous use of space which would have used the entire space underneath my sink for just the meter, and asked if my plumber could fit the meter as well. This did not seem to be allowable, but they sent a man to look at the possibilities; he actually brought a meter with him, which somehow I persuaded him to leave and I then paid my plumber £96 to fit it right at the back of the sink cupboard. Good job! All up and running.
I have today received their latest bill and I'm £165 in credit. They wouldn't pay my £96 but the nice young woman has used a low figure for estimating the consumption if I'd had a meter which gave valid readings. This has (deliberately or inadvertently?) given that sum back to me, so I'll let that drop, as I am really fed up with phoning their hepdesk!
I had identified that the mains supply for the house had a stop cock under a plastic cover in the pavement; there were two stop cocks inside the house; the main one was in the hall and fed a flexible (washing machine quality?) pipe which went to the bathroom above and had supplied the cold tank (which had already been removed to the garden!). The other supply went to the old extension, and I had had the plumber fit a new internal tap so that we could properly attach a hose for the plastering and floor laying. When that was working I had the plumber feed the other supply through to the kitchen so that it was ready there, but out of the way of planned work.
So, early in 2011 I made an application to Thames Water for a meter. They sent out a workman (actually a contractor) who looked at everything and asked me if I wanted an internal or external meter. I said "external if possible", not wanting to have a meter getting in the way of the kitchen floor and plaster work about to be tackled. Little did I know. A crew was sent without delay, and they very speedily fitted a meter under the pavement. OK so far!
There was an amusing small glitch later in the year - when doing the extension we found that the water supply in the old extension actually carried on under the brick wall separating our back gardens and fed our neighbour's outside tap. This would not normally be a concern, but in fact it had been used as the sole supply for the construction of a £3 million building at the back; this was an arrangement which preceded the sale of next door, and when they purchased it, the builders had an obligation to pay his water bill for a period. As it happens, the construction had been completed about two months before I asked for the meter, which was fortuitous. My neighbour admitted that he had been puzzled that his water bill was completely normal!
Having moved in (July 2011), I had a very low bill the next month, followed in February 2012 by a quite reasonable one of £91 for a six month period. You can imagine my consternation when in August 2012 I received my second six month bill for £274. Now, the house next door (not our other half but a separate cottage) had been rented out from February 2012, having been empty for over a year; it was not difficult to do a quick bit of detective work and spot that there was no other water main cover in the pavement for 15 metres, and so clearly they had fitted the meter to a shared supply. D'oh!
I can write this now in the cool light of reflection of the last five months. That time was regularly punctuated with me telephoning Thames Water and getting not much satisfaction. It took a considerable amount of persistence to resolve this issue, and their first level help desk staff became predictable in their complete lack of ability to achieve anything. Their typical response was to say that someone would call in 6 working days but nothing happened. One really stupid thing that someone did was to rescind all their bills back to when the meter was fitted (although the meter readings WERE valid and acceptable to me for almost a year), and then send out a bill for the standard rate for April 2011 to April 2013, so that I owed them £789, payable at once!
If you have the same sort of issue, my top tip is that at the first excuse you say the magic words "I want to escalate this issue". Once I had been passed on to the "Escalation Department" I had much better service and progress was made, ultimately successfully. Sadly for me that did not happen until I had wasted nine weeks and many phone calls in trying. A second top tip is to keep a good record of your phone calls; it really gets the attention of the Manager in the "Escalation Department" when you can name the idiot who failed to do what he promised four months ago, and when you give a string of names and dates they quickly realize that you do indeed have a point. The other thing to remember is that it is (usually) not the fault of the person to whom you are speaking, but one of their colleagues, so a plaintive sob story with a hint of desperation gets a far better response than shouting at the poor unfortunate one who was unlucky enough to get your call.
The result for me was that in order to have a meter it had to be internal. Of course, this would have been much easier if it had been done before installing our new kitchen (June 2011), so there was a bit of an issue as to where to put it. The only sensible place was under the sink, and Thames Water said that their installer needed six inches "all the way around" to fit the meter. Now, it is natural to fit pipes within two inches of the wall and floor, isn't it? This is what my plumber had done, and they wanted me to sort out the pipes before they would send someone to fit the meter. I rather griped at that generous use of space which would have used the entire space underneath my sink for just the meter, and asked if my plumber could fit the meter as well. This did not seem to be allowable, but they sent a man to look at the possibilities; he actually brought a meter with him, which somehow I persuaded him to leave and I then paid my plumber £96 to fit it right at the back of the sink cupboard. Good job! All up and running.
I have today received their latest bill and I'm £165 in credit. They wouldn't pay my £96 but the nice young woman has used a low figure for estimating the consumption if I'd had a meter which gave valid readings. This has (deliberately or inadvertently?) given that sum back to me, so I'll let that drop, as I am really fed up with phoning their hepdesk!
Monday, 21 January 2013
Little Bits of Progress
It's really cold outside right now, so you won't be surprised at my lack of activity out there, even before it snowed. All I can manage is an occasional quick foray to feed the birds or to bring in some more wood for the lounge fire - it seems to us that this fire is producing more heat into the room than last winter, but perhaps that's just us being older? We're still burning the trees from the front garden and the (untreated) old battens off the roof - I think that will see us into next winter fairly comfortably. There is a nice feeling of burning fuel that actually cost us nothing as the battens would have gone to landfill if I had left them for the roofers to get rid of; the only cost of the trees was that the tree-fellers had to do a few more strokes with their chainsaw to give me the fire-friendly lengths to split.
So, I've been doing little things inside - the sort of job that normally I don't find time for as there is usually something far more important to do. Last winter there were lots of tasks left on the rebuilt extension, but now there's no excuse. The first thing to do was to sort the wardrobe: I built this in 2011 as a stud wall, a foot in front of the fireplace in our bedroom, the whole way across the room. This was done so that when we moved in we had somewhere to put our clothes which was a little less dusty! Sadly, the recycled doors sat forlornly (getting in the way) awaiting repair, repainting and fitting from then until I managed to do the repairs and repainting last autumn (only a whole year...). However, the fitting had to wait and was eventually done in a hurry on the Saturday before Christmas 2012 (that was 17 months...) as I had some time and realized that it would make Jane smile. They are all done now and look really good - they even make the room seem bigger as there is nothing falling out of the wardrobe!
Also before Christmas I made a new coat rack for the hall, recycling some old coat hooks which I had kept from two years previously. The previous coat rack is still in place but hardly used as (a) it is above the radiator and seems to absorb the heat and (b) it is so high that Jane cannot hang coats onto it! Having moved the coats, the hall now seems larger as well.
Now I've moved on to finishing the tiling in the bathroom - there was an annoying bit which was where the tiles met the window frame; this needed some decent cutting and of course I had bought a good tile cutter ages ago but still never got round to this little job... It's done now and is awaiting grouting - that reminds me, there's also a bit left for grouting in the extension utility.
Perhaps next I will see if it is possible to fit the bath panel properly - this has also been left since we moved in, resting almost in place, due to the impossibility (it seems) of getting it to go under the lip of the bath. Then there's the repainting of the doors on the landing; these were also done just before we moved in, and it is amazing to see how much shrinkage there has been since then - on the door panels there is a whole centimetre of dark wood showing where I had painted white. The dampness in the house must have been much worse than I had realized.
One other external and long awaited job that was done before it snowed was that the roofers came back to fix a slipped slate which had been outstanding since about last April. This had not been done because it was directly under the chimney and thus a roofers ladder couldn't be used, but it was too far up the roof to allow it to be done with a ladder resting at gutter level. Hence a cherry picker was required and, to save money, this had to wait until one was hired for another job. Hence after such a long wait I was quite surprised when they turned up in early January. As you might expect, it took longer to position the cherry picker than to actually do the job, which was a single lead tingle to hold the slate in place. Since the cherry picker was resting on the lawn, they needed some spreaders to stop the feet digging in, so I found some rafter ends (7" x 2") from the construction of the extension and left them to it. When I came back, they had finished and gone, taking my bits of rafter with them! Oh well, I suppose they weren't valuable, but they have been useful for a good number of tasks in the last year.
So, I've been doing little things inside - the sort of job that normally I don't find time for as there is usually something far more important to do. Last winter there were lots of tasks left on the rebuilt extension, but now there's no excuse. The first thing to do was to sort the wardrobe: I built this in 2011 as a stud wall, a foot in front of the fireplace in our bedroom, the whole way across the room. This was done so that when we moved in we had somewhere to put our clothes which was a little less dusty! Sadly, the recycled doors sat forlornly (getting in the way) awaiting repair, repainting and fitting from then until I managed to do the repairs and repainting last autumn (only a whole year...). However, the fitting had to wait and was eventually done in a hurry on the Saturday before Christmas 2012 (that was 17 months...) as I had some time and realized that it would make Jane smile. They are all done now and look really good - they even make the room seem bigger as there is nothing falling out of the wardrobe!
Also before Christmas I made a new coat rack for the hall, recycling some old coat hooks which I had kept from two years previously. The previous coat rack is still in place but hardly used as (a) it is above the radiator and seems to absorb the heat and (b) it is so high that Jane cannot hang coats onto it! Having moved the coats, the hall now seems larger as well.
Now I've moved on to finishing the tiling in the bathroom - there was an annoying bit which was where the tiles met the window frame; this needed some decent cutting and of course I had bought a good tile cutter ages ago but still never got round to this little job... It's done now and is awaiting grouting - that reminds me, there's also a bit left for grouting in the extension utility.
Perhaps next I will see if it is possible to fit the bath panel properly - this has also been left since we moved in, resting almost in place, due to the impossibility (it seems) of getting it to go under the lip of the bath. Then there's the repainting of the doors on the landing; these were also done just before we moved in, and it is amazing to see how much shrinkage there has been since then - on the door panels there is a whole centimetre of dark wood showing where I had painted white. The dampness in the house must have been much worse than I had realized.
One other external and long awaited job that was done before it snowed was that the roofers came back to fix a slipped slate which had been outstanding since about last April. This had not been done because it was directly under the chimney and thus a roofers ladder couldn't be used, but it was too far up the roof to allow it to be done with a ladder resting at gutter level. Hence a cherry picker was required and, to save money, this had to wait until one was hired for another job. Hence after such a long wait I was quite surprised when they turned up in early January. As you might expect, it took longer to position the cherry picker than to actually do the job, which was a single lead tingle to hold the slate in place. Since the cherry picker was resting on the lawn, they needed some spreaders to stop the feet digging in, so I found some rafter ends (7" x 2") from the construction of the extension and left them to it. When I came back, they had finished and gone, taking my bits of rafter with them! Oh well, I suppose they weren't valuable, but they have been useful for a good number of tasks in the last year.
Thursday, 3 January 2013
Fat Birds and Drunk Slugs
We've been getting some surprising pleasure form watching the antics of the birds in our back garden. I knew there were lots of bird resident locally, and was quite worried about depriving many of them of their nesting places when we cleared the garden. Hence I made sure that the hedgerow around the walls of the garden was left as it was, with thick ivy and various other shrubs growing up/on/through it. Last autumn we put up a bird feeder in which Jane puts those fat balls that you can buy; this hangs from the apple tree just outside the new kitchen window and so we have a good view of the goings-on.
Firstly, there is a healthy flock of house sparrows here (some of who actually used to live in the wall of our house!), and they are quite adept at imitating blue tits and hanging on the feeder cage to peck the fat. The apple tree has a high canopy and a single low horizontal branch which is bare for the first ten feet, and there are often three or four sparrows perched there waiting whilst others are feeding. Then there are some Blue Tits and the odd Great Tit - they prefer not to mix with the sparrows who are quite noisy and possessive. A surprise earlier in the year was the sight of three juvenile Long-Tailed Tits, and we were very happy recently to have further sightings of several of these relatively unusual birds. There are a couple of Dunnock who only peck at the bits on the ground which have fallen from the feeder, joined occasionally by a Chaffinch. Finally, there's a Robin who is more than possessive. He is a little thug who terrorizes the other small birds to claim ownership of the worn patch immediately below the feeder, and occasionally (largely unsuccessfully) tries his own impersonation of Blue Tit on the feeder.
The heavy mob obviously are ground feeders as well. There's a number of Wood Pigeons (and the Robin knows his place with them), but there's also a pair of Collared Doves who dislike the Wood Pigeons! It's a real soap opera out there sometimes. Blackbirds are rarely seen - there was a melodious one who used to sing beautifully, up and down the street every morning and evening, but he fell silent in August and so I expect a cat got him. The last of the ground feeders is a mouse who I have seen just twice, when the area was quiet. We also have a Wren who lives in the hedge on the wall, but he is rarely seen and is cetainly not tempted by the fat balls.
The front garden wall is unfortunately just the right height for passers-by to sit on. I don't usually mind this, apart from those who sit there talking loudly, especially when we are trying to sleep, but since I did the secondary glazing this has not been such a problem. I also object to those who sit there eating and drinking (again, usually at night) and then leave their rubbish in our garden. One of these the other day had clearly had too much to drink, as I went to pick up a can in the morning and found that it was still sealed. Shame I don't drink lager... At the same time I picked up another open can which clearly had some liquid still inside, and found when I tipped it out that it contained about 20 dead slugs! Obviously the advice to gardeners to use beer in a can to eradiate slugs does work!
Firstly, there is a healthy flock of house sparrows here (some of who actually used to live in the wall of our house!), and they are quite adept at imitating blue tits and hanging on the feeder cage to peck the fat. The apple tree has a high canopy and a single low horizontal branch which is bare for the first ten feet, and there are often three or four sparrows perched there waiting whilst others are feeding. Then there are some Blue Tits and the odd Great Tit - they prefer not to mix with the sparrows who are quite noisy and possessive. A surprise earlier in the year was the sight of three juvenile Long-Tailed Tits, and we were very happy recently to have further sightings of several of these relatively unusual birds. There are a couple of Dunnock who only peck at the bits on the ground which have fallen from the feeder, joined occasionally by a Chaffinch. Finally, there's a Robin who is more than possessive. He is a little thug who terrorizes the other small birds to claim ownership of the worn patch immediately below the feeder, and occasionally (largely unsuccessfully) tries his own impersonation of Blue Tit on the feeder.
The heavy mob obviously are ground feeders as well. There's a number of Wood Pigeons (and the Robin knows his place with them), but there's also a pair of Collared Doves who dislike the Wood Pigeons! It's a real soap opera out there sometimes. Blackbirds are rarely seen - there was a melodious one who used to sing beautifully, up and down the street every morning and evening, but he fell silent in August and so I expect a cat got him. The last of the ground feeders is a mouse who I have seen just twice, when the area was quiet. We also have a Wren who lives in the hedge on the wall, but he is rarely seen and is cetainly not tempted by the fat balls.
The front garden wall is unfortunately just the right height for passers-by to sit on. I don't usually mind this, apart from those who sit there talking loudly, especially when we are trying to sleep, but since I did the secondary glazing this has not been such a problem. I also object to those who sit there eating and drinking (again, usually at night) and then leave their rubbish in our garden. One of these the other day had clearly had too much to drink, as I went to pick up a can in the morning and found that it was still sealed. Shame I don't drink lager... At the same time I picked up another open can which clearly had some liquid still inside, and found when I tipped it out that it contained about 20 dead slugs! Obviously the advice to gardeners to use beer in a can to eradiate slugs does work!
Sunday, 16 December 2012
Reflections on the Last Two Years
Now that I have a bit more time for activities other than building work, I've been thinking about what has been acheived in the last two years and two months. Specifically, I've been thinking about two aspects of the work, namely the things I've done which have really pleased me, and the things that I would rather had been done differently.
Under the latter heading come a few things which still bug me:
Under the latter heading come a few things which still bug me:
- The attitude of the Conservation Officer - this relationship seemed to have gone wrong near the start, but I still don't really know why, other than because (just possibly) the CO really IS an unhelpful person.
- The fact that Highways at the County Council told me that I could not widen the existing gateway to make a single driveway entrance for both houses as it was too close to a junction, but then (after I had made an entrance in the old wall) they allowed my new neighbour to make a new entrance even closer to the junction!
- A newly laid slate has slipped from the roof to the gutter, but the roofer has yet to come and fix it.
- The new kitchen sash window is four over four, not two over two as the rest of the windows.
- There is still no vent to the kitchen...
- Thames Water fitted an external meter in the pavement and this has been found to be a joint supply. Now we have to get an internal meter fitted, but that would have been so much easier if done before the new kitchen was fitted, as I intended.
- My new loft hatch is not quite square, because the joists were not parallel!
- The new extension is not exactly as intended - the roof is higher, the chimney lower and the plasterer gave me incorrect answers to two clear questions, with the result that the internal work I did is not perfect; one window cill has thicker render than he said, so it's almost level with the top of the lower window frame, and a plastered stud wall is thinner than the rendered blocks that it rests on.
- The stone wall where I filled in the bottom of the old doorway
- The wall which I lime-plastered myself (the stone wall which is the join between the old house and new-build extension)
- The new 6' stone wall beside the front door, and the attached gates
- The new sash window which cost just £95 from a reclamation yard
- The front room floor where I replaced bits of joists and re-laid most of the boards plus some reclaimed ones
- The stud wardrobe frontage which I built for the master bedroom
- The wood-burning stove in the kitchen, in the alcove which I "found" by removing the old tiled fireplace
- The recently fitted secondary glazing (we are cosy, and it is quieter now)
- The limecrete/black limestone floor in the kitchen (laid by Chris, Shane and me)
- The black limestone floor in the new extension which I laid entirely by myself (on concrete...)
- The extension roof on which I laid over half the slates in just over a day on my own, much to Chris's surprise
- The casement window in the new extension which I salvaged from the old extension and did a major repair job
- The 1800+ Imperial bricks from the old extension which Jane and I salvaged and were re-used in the new extension (I only had to buy about 200 more)
- All the other little bits and pieces from the old building which I laboriously removed, kept and re-used
- Buying my own mixer, instead of hiring one
- Deciding that I would manage the entire process myself, instead of paying a builder to project manage it
Tuesday, 20 November 2012
Secondary Glazing
I mentioned before how the Conservation Officer (erroneously in most people's view) sweepingly declared that "you can't have double glazing in a listed building". That was in relation to a brand new sash window (far right below) which replaced a metal Crittal door and two windows on the side of the house (near right below), which seemed an inexplicable decision;
I made sure that the design of the window will allow for double glazing
if I so choose in the future, and the CO never realized! I should point
out that I agree that, in a building like this, one should not remove old
sash windows and fit uPVC ones as
they always look wrong - the thickness of the glazing bars is a real
give away apart from the lack of wavy glass - but I did think that DG in a new window would be allowed. Anyway, with that history, I was never going to bother to mention the subject again to the CO, and so the house has remained draughty with a corresponding high gas bill last winter. As a result, I turned my thoughts to secondary glazing, and recently this came to the top of my list of "Things to do before winter".
Secondary glazing is acceptable on period properties without conservation consent as it a reversible change (other than a few screw holes), and also it is not like double glazing, in that the space between the two panes is not sealed so it does not provide the same barrier to heat loss. Basically it does reduce heat loss to an extent, but it also reduces draughts and noise. The sash windows in this house are ideal for secondary glazing as the frame of the sash provides a good flat surface for the inner sheet. You can get complicated systems which, for instance, add sliding glass in a frame, but I chose a simpler system which comprises a sheet of acrylic with a soft plastic edging strip, held against the sash window by little nylon clips and screws. I'm sure there are other suppliers, but I bought all my stuff from Tubeway Easyfix (http://www.tubeway.co.uk/). They were kind enough to send me, free of charge, a plastic mitre block for cutting the plastic edging, which got omitted from my order. Since this item retails at £7.05 + VAT, I'm glad I didn't pay for it; you would think they would always throw such a little bit of plastic in for nothing.
The draughts have largely gone and the difference in room temperature is quite noticeable; it really does make a difference and there is now less need to keep all internal doors closed. I've still got to do one in the hall, one in the extension and a pair in the bathroom (left); the bathroom ones fell to the end of the list due to the refurbishment work needed on the window frame and the fact that I will have to re-fit the venetian blind on another bit of stripwood to hold it away from the acrylic. The main renovation of all these windows will get done next summer (if we have one) and the main aim will be to keep the old glass wherever possible.
Having eliminated a lot of draughts, I will have to make sure that the house is still well ventilated - there has been no dampness or condensation anywhere in the last year since it dried out, apart from what we caused with cooking and showers.
I made sure that the design of the window will allow for double glazing
if I so choose in the future, and the CO never realized! I should point
out that I agree that, in a building like this, one should not remove old
sash windows and fit uPVC ones as
they always look wrong - the thickness of the glazing bars is a real
give away apart from the lack of wavy glass - but I did think that DG in a new window would be allowed. Anyway, with that history, I was never going to bother to mention the subject again to the CO, and so the house has remained draughty with a corresponding high gas bill last winter. As a result, I turned my thoughts to secondary glazing, and recently this came to the top of my list of "Things to do before winter". Secondary glazing is acceptable on period properties without conservation consent as it a reversible change (other than a few screw holes), and also it is not like double glazing, in that the space between the two panes is not sealed so it does not provide the same barrier to heat loss. Basically it does reduce heat loss to an extent, but it also reduces draughts and noise. The sash windows in this house are ideal for secondary glazing as the frame of the sash provides a good flat surface for the inner sheet. You can get complicated systems which, for instance, add sliding glass in a frame, but I chose a simpler system which comprises a sheet of acrylic with a soft plastic edging strip, held against the sash window by little nylon clips and screws. I'm sure there are other suppliers, but I bought all my stuff from Tubeway Easyfix (http://www.tubeway.co.uk/). They were kind enough to send me, free of charge, a plastic mitre block for cutting the plastic edging, which got omitted from my order. Since this item retails at £7.05 + VAT, I'm glad I didn't pay for it; you would think they would always throw such a little bit of plastic in for nothing.
There are relatively few issues with this system, although the price of the acrylic sheet surprised me; I used 2mm thick sheet, although you can use 3mm or 4mm (even more expensive!). One issue seems to be the size of the sheets; most of my windows are 90cm wide, and so need acrylic sheet which is about 95cm wide; of course, one of the standard widths is 92cm so I had to go to the next size up, with consequent additional waste and cost. One potential difficulty is cutting the acrylic; I was told that could probably score the acrylic and break it like glass, but even with 2mm thick, this just did not work reliably. Hence it had to be cut and I quickly proved that you cannot use a hand saw as this causes cracks along with a very rough edge. However my jigsaw with a fine blade proved to be the business so long as you don't move it too quickly, but even then you need to support the edge at the point of cutting or you get a jagged edge with cracks. Straight edges help with positioning the clips, so I always made sure I had an edge cut by the supplier along the bottom when I fitted the first clips.
I've now done five windows, including the large one in the main bedroom. This one was so large that I was unable to buy a sheet of acrylic big enough, so I have made a wooden horizontal support which runs across in line with the join in the sashes, so that it isn't seen from outside. 

This support was made from four bits of stripwood, and there is a groove top and bottom to hold the edges of the acrylic; the strength is primarily from an expensive piece of hardwood (30mm x 10mm) which forms the visible side in the room. Photos of the system are quite difficult to do, as all they show are the windows and you can hardly see the edge of the acrylic, which is the whole point really. However, here's a detail picture so you can see the edging and the clips:
The draughts have largely gone and the difference in room temperature is quite noticeable; it really does make a difference and there is now less need to keep all internal doors closed. I've still got to do one in the hall, one in the extension and a pair in the bathroom (left); the bathroom ones fell to the end of the list due to the refurbishment work needed on the window frame and the fact that I will have to re-fit the venetian blind on another bit of stripwood to hold it away from the acrylic. The main renovation of all these windows will get done next summer (if we have one) and the main aim will be to keep the old glass wherever possible.
Having eliminated a lot of draughts, I will have to make sure that the house is still well ventilated - there has been no dampness or condensation anywhere in the last year since it dried out, apart from what we caused with cooking and showers.
Thursday, 1 November 2012
A 100th Celebration
No, I'm not that old although I do sometimes feel it.
The celebration is because the Blogger editor tells me that this my 100th post since I started this blog twenty seven months ago. Having a back-up on Word, the word count tells me that it now comprises almost 62,000 words, which is probably a whole book, I suppose. The blog has been quite useful for myself when I have forgotten how, when or why I did some particular thing, and it has also encouraged me to take a couple of thousand pictures of the work as it progressed. Mind you, there are still some things of which I have managed to fail to take pictures; this surprises me as I seem to have the camera close to hand most days.
Some unexpected good weather this week has allowed me to lay some more concrete near the back gate and to start finishing the low wall in the front which leads up to the new wall. I'm still putting off the inside jobs until the weather is too bad to work outdoors at all.
Finishing the concrete at the back gate was a relief; I had already purchased a monkey tail bolt (right) - the sort with a long handle to operate it, as these are often used at the top and bottom of large doors and gates. Since I wanted the half-inch square bolt to locate in the concrete, I had to leave that bit of concreting until after I had fitted the gate and the bolt, so that I could set the bolt in its receptacle in the ground and concrete around the receptacle (a bit of square tube, just visible in the photo); even so, the bolt needed modifying as I wanted a greater travel than any bolt I found, since I wasn't sure about how close to the ground I would get the bottom of my gate. This modification was easy once I had found some rivets to allow me to drill out the existing and move the retaining bracket up a bit. In the event, the gate is satisfyingly low (ref cats, comment below) and I could have moved the bracket a bit less.
I treated myself in a shop recently and bought a blacksmith-made Suffolk latch (photo left) for these gates. You know, the sort of one where you operate a lever on one side with your thumb above the handle, and it lifts the latch inside. I have to say, at £35 it was quite expensive compared to mass-produced stuff from W and HB, but they cannot even get close to the quality and feel of something properly made like this. (Yes, I need to restore the paint finish...)
The gates need to be secure so there are two other horizontal bolts plus a support strut which goes to the new gate pillar; of course, when secured the Suffolk latch will not open the gates from outside, but other than some ugly padlock I could not see how I could secure and open the gates from both sides.
In fact, what I really wanted to secure the gates with
was one of those bits of 4 by 2 which fits into brackets on either side
- like an old fortress gate. I would have wanted to use oak (which is
obtainable) but I couldn't find any nice sturdy brackets anywhere;
brackets made out of wood would be a bit too chunky for the size of
these gates. Anyway, the gates are now pretty secure and, to my delight,
they keep the local cats out; one of these is a huge, insolent black
moggy and another is pure white. They seem to have used the garden as
their own pathway from front to back for years, stopping for a bird meal
somewhere if they got lucky.
I also want to put a strip of wood down the front edge of the right hand gate as a stop for the left hand one; I found a long strip of half inch seasoned old pine removed from somewhere, but I can't recall exactly where. As I've said before, keeping something which "looks useful" for a year or eighteen months on the off-chance, and then finding a use for it is very satisfying as well as economic (I once used a car light bulb which I had bought 17 years previously for an earlier car!) Strip, sand, cut to length, fill, sand, prime, undercoat, top coat and then I can fit it. Then there's just a drip strip along the top of both gates and a quick touch up of the paint, and they will be done.
There's then just the small job of painting the left hand gate black. This is not so easy as the paint is some incredibly hard modern stuff on which all known sandpaper seems to have no discernible effect. I did the road side a long time ago using my sander plus a good number of sheets of aluminium oxide paper, so I guess it will be the same again, but largely by hand this time thanks to the ledges and braces. You can see why I am leaving that task for later!
The celebration is because the Blogger editor tells me that this my 100th post since I started this blog twenty seven months ago. Having a back-up on Word, the word count tells me that it now comprises almost 62,000 words, which is probably a whole book, I suppose. The blog has been quite useful for myself when I have forgotten how, when or why I did some particular thing, and it has also encouraged me to take a couple of thousand pictures of the work as it progressed. Mind you, there are still some things of which I have managed to fail to take pictures; this surprises me as I seem to have the camera close to hand most days.
Some unexpected good weather this week has allowed me to lay some more concrete near the back gate and to start finishing the low wall in the front which leads up to the new wall. I'm still putting off the inside jobs until the weather is too bad to work outdoors at all.
Finishing the concrete at the back gate was a relief; I had already purchased a monkey tail bolt (right) - the sort with a long handle to operate it, as these are often used at the top and bottom of large doors and gates. Since I wanted the half-inch square bolt to locate in the concrete, I had to leave that bit of concreting until after I had fitted the gate and the bolt, so that I could set the bolt in its receptacle in the ground and concrete around the receptacle (a bit of square tube, just visible in the photo); even so, the bolt needed modifying as I wanted a greater travel than any bolt I found, since I wasn't sure about how close to the ground I would get the bottom of my gate. This modification was easy once I had found some rivets to allow me to drill out the existing and move the retaining bracket up a bit. In the event, the gate is satisfyingly low (ref cats, comment below) and I could have moved the bracket a bit less.
I treated myself in a shop recently and bought a blacksmith-made Suffolk latch (photo left) for these gates. You know, the sort of one where you operate a lever on one side with your thumb above the handle, and it lifts the latch inside. I have to say, at £35 it was quite expensive compared to mass-produced stuff from W and HB, but they cannot even get close to the quality and feel of something properly made like this. (Yes, I need to restore the paint finish...)
The gates need to be secure so there are two other horizontal bolts plus a support strut which goes to the new gate pillar; of course, when secured the Suffolk latch will not open the gates from outside, but other than some ugly padlock I could not see how I could secure and open the gates from both sides.
In fact, what I really wanted to secure the gates with
was one of those bits of 4 by 2 which fits into brackets on either side
- like an old fortress gate. I would have wanted to use oak (which is
obtainable) but I couldn't find any nice sturdy brackets anywhere;
brackets made out of wood would be a bit too chunky for the size of
these gates. Anyway, the gates are now pretty secure and, to my delight,
they keep the local cats out; one of these is a huge, insolent black
moggy and another is pure white. They seem to have used the garden as
their own pathway from front to back for years, stopping for a bird meal
somewhere if they got lucky.I also want to put a strip of wood down the front edge of the right hand gate as a stop for the left hand one; I found a long strip of half inch seasoned old pine removed from somewhere, but I can't recall exactly where. As I've said before, keeping something which "looks useful" for a year or eighteen months on the off-chance, and then finding a use for it is very satisfying as well as economic (I once used a car light bulb which I had bought 17 years previously for an earlier car!) Strip, sand, cut to length, fill, sand, prime, undercoat, top coat and then I can fit it. Then there's just a drip strip along the top of both gates and a quick touch up of the paint, and they will be done.
There's then just the small job of painting the left hand gate black. This is not so easy as the paint is some incredibly hard modern stuff on which all known sandpaper seems to have no discernible effect. I did the road side a long time ago using my sander plus a good number of sheets of aluminium oxide paper, so I guess it will be the same again, but largely by hand this time thanks to the ledges and braces. You can see why I am leaving that task for later!
Saturday, 27 October 2012
Woolly Loft Insulation
Having completed the wall last week (at last), I found myself curiously relaxed this week. When the weather is OK I will finish the gates, but they are secure and useable for now, so what to do? Then I remembered my list (from August) of the tasks that I wanted to do before winter. Most of these were left from last winter as the extension and the wall have managed to fill most of my time, as well as using most of my energy. I am painfully aware that jobs like finishing the bathroom and the bedroom wardrobe have literally not been touched since we moved in (July 2011); happily, 'er indoors has been most patient but I'm aware that I can't rely on that indefinitely.
Looking at the weather forecast, it was easy to decide that the loft insulation was top of the list. A long time ago I opted for a "cold roof" which means laying the insulation onto the joists and ensuring that the loft space above is well ventilated; I bought lots of "Thermafleece PB20" almost TWO YEARS AGO with the intention of laying it as soon as possible after we had plastered the ceilings. However, things often don't work out as you expect, do they? This stuff isn't cheap but it is far preferable to fit something like this in an old building because it's breathable, whereas that modern stuff actually prevents the passage of water vapour and it never dries out if it gets soggy. I managed to do about two-thirds of the loft before the onset of winter last year, but left the difficult bit around the hatch until last. Now it was time to tackle this.
"Thermafleece PB20" is actually 60% British sheeps' wool and 40% recycled polyester which gives it body. It is much nicer to handle than man-made stuff as it doesn't irritate your skin. However, I found on the first two occasions I used it that it can irritate your throat (or perhaps that was the dust in the loft); I developed a cough in the following week each time and so I then decided to always use a face mask - this has worked!
It is however more difficult to cut than other modern stuff, and you can't tear it easily. It comes in compressed rolls and I realized that it was far preferable to try to cut it whilst still compressed. I used an 8" carving knife for the cutting, with frequent pauses to re-sharpen it on a steel. I either cut it on the roll by piercing the roll radially many times with the knife and then hacking at the remaining bits, or else by laying it on a board and slicing it whilst also trying to keep it compressed. Both these were nevertheless somewhat trying procedures, as well as being tiring on your arms. Annoyingly I found an easier way this week, only about an hour before I finished. I found this by accident as I was cutting off the end a piece which was going to fit up to a joist; I laid it over the joist and put another piece of wood under the insulation so that I was cutting between the pieces of wood. For some reason cutting down and through the fleece was very easy and effective. What was a two minute job became a ten second one!
I have laid three layers: a 70mm layer between the joists, and two 100mm layers over the top. Indeed, this seems a bit "over the top" but the levels of insulation recommended have increased since the days of a simple three inch layer of horrible fibreglass stuff. The thickness of the top layer can be seen in the photo on the left. Note that in all these photos there is a good gap between the end of the insulation and the roof itself, as ventilation is important (contrary to those who would like us to live in sealed boxes!).
I had a spot of bother when doing this job in 2011 as I wanted to board the area under the roof light. Unfortunately this was near the central internal wall and the joists on the front of the house were larger than those on the back, so you can imagine the issues I had with relative heights of joists, insulation and board. That was when I ran out of time and energy over a year ago, but this time I persevered and have succeeded.
The last job I had to do was to fit the loft hatch and add some insulation on that as well, as it was probably a major source of draughts last year. Hopefully the expense of this stuff will be borne out by the improvement in the warmth of the house and a reduction in heating bills over the duration of our retirement. You can but hope!
Looking at the weather forecast, it was easy to decide that the loft insulation was top of the list. A long time ago I opted for a "cold roof" which means laying the insulation onto the joists and ensuring that the loft space above is well ventilated; I bought lots of "Thermafleece PB20" almost TWO YEARS AGO with the intention of laying it as soon as possible after we had plastered the ceilings. However, things often don't work out as you expect, do they? This stuff isn't cheap but it is far preferable to fit something like this in an old building because it's breathable, whereas that modern stuff actually prevents the passage of water vapour and it never dries out if it gets soggy. I managed to do about two-thirds of the loft before the onset of winter last year, but left the difficult bit around the hatch until last. Now it was time to tackle this.
"Thermafleece PB20" is actually 60% British sheeps' wool and 40% recycled polyester which gives it body. It is much nicer to handle than man-made stuff as it doesn't irritate your skin. However, I found on the first two occasions I used it that it can irritate your throat (or perhaps that was the dust in the loft); I developed a cough in the following week each time and so I then decided to always use a face mask - this has worked!
It is however more difficult to cut than other modern stuff, and you can't tear it easily. It comes in compressed rolls and I realized that it was far preferable to try to cut it whilst still compressed. I used an 8" carving knife for the cutting, with frequent pauses to re-sharpen it on a steel. I either cut it on the roll by piercing the roll radially many times with the knife and then hacking at the remaining bits, or else by laying it on a board and slicing it whilst also trying to keep it compressed. Both these were nevertheless somewhat trying procedures, as well as being tiring on your arms. Annoyingly I found an easier way this week, only about an hour before I finished. I found this by accident as I was cutting off the end a piece which was going to fit up to a joist; I laid it over the joist and put another piece of wood under the insulation so that I was cutting between the pieces of wood. For some reason cutting down and through the fleece was very easy and effective. What was a two minute job became a ten second one!
I have laid three layers: a 70mm layer between the joists, and two 100mm layers over the top. Indeed, this seems a bit "over the top" but the levels of insulation recommended have increased since the days of a simple three inch layer of horrible fibreglass stuff. The thickness of the top layer can be seen in the photo on the left. Note that in all these photos there is a good gap between the end of the insulation and the roof itself, as ventilation is important (contrary to those who would like us to live in sealed boxes!).I had a spot of bother when doing this job in 2011 as I wanted to board the area under the roof light. Unfortunately this was near the central internal wall and the joists on the front of the house were larger than those on the back, so you can imagine the issues I had with relative heights of joists, insulation and board. That was when I ran out of time and energy over a year ago, but this time I persevered and have succeeded.
The last job I had to do was to fit the loft hatch and add some insulation on that as well, as it was probably a major source of draughts last year. Hopefully the expense of this stuff will be borne out by the improvement in the warmth of the house and a reduction in heating bills over the duration of our retirement. You can but hope!
Thursday, 18 October 2012
O Wall! O Sweet, O Lovely Wall!
The wall is complete! (Apart from a few details... )
Many people better educated than myself might recognise the above quote from "A Midsummer Night's Dream". You might think that this would be the most appropriate quotation for me (despite my failure in English Literature 'O' Level!), as I savour my hard-won success. However, given the way I feel right now, a rather more appropriate quotation is found just a few lines further on in the same opus: "O Wall! Full often hast thou heard my moans"!
I sit here feeling very tired after a long and hectic day's work. I had finished off the stone structure on Tuesday and today was the icing on the cake, or rather the copers on the wall. I'm quite surprised that I have built most of the structure using stone that was already at the property; all I needed to acquire was the faced stone (including the pintle blocks for the gate hinges) which forms the quoin. I was pleased that it was pretty level for the coping stones to be laid, and also when I made a small framework to lie on the top I proved that it was pretty well parallel as well. I used this to draw a line showing the width of the coping stones and, hence, where I needed to grind an angle on the (few) protruding bits. There is a bend in the wall - I didn't want to make this too easy for myself! - and of course I had forgotten about the coping stones when I designed the bend. This bend was required because I didn't want to uproot the ivy climbing up the boundary wall, which would have been necessary if the new wall had been straight. Another difficulty was that the soil rises in the direction of the boundary wall, so the foundations required a lot of thought.
Today I hired an angle grinder again [Top Tip: buy your own blade if you think you'll hire one more than once] and spent the morning cutting and grinding in preparation for the afternoon when my son arrived (with grandson) to help with the difficult bit - lifting the copers carefully into position on their mortar bed. Since the heaviest weighs about 45kg, you can imagine that I had quickly decided that this was too much for me. I made a mix of NHL (sharp sand: building sand: NHL3.5 in 5:1:2 ratio). This is basically standard 3:1 but I added the local building sand which gives a good colour match to the house pointing. My grandson loved the mixer but was otherwise confined indoors as I had to wield the grinder again to make the last coping stones fit.
However, in my haste I made too much mortar and so after my son left I spent the next three hours doing pointing and minor repairs to use it up; I gave up when it started to rain as dusk was falling.
I'm pretty pleased with the result. A lot of thought has gone into this wall; I find that things usually turn out better if you think long and hard before you start, and try to imagine exactly how things will be done and what problems might ensue. (There have also been a few sleepless nights.) My vision was to build a security wall which would look as though it had been there for years, and I'd like to think that I have succeeded. However, I'm glad I'm not doing that for a living - I started in May and thought it would be done by early July!
Many people better educated than myself might recognise the above quote from "A Midsummer Night's Dream". You might think that this would be the most appropriate quotation for me (despite my failure in English Literature 'O' Level!), as I savour my hard-won success. However, given the way I feel right now, a rather more appropriate quotation is found just a few lines further on in the same opus: "O Wall! Full often hast thou heard my moans"!
I sit here feeling very tired after a long and hectic day's work. I had finished off the stone structure on Tuesday and today was the icing on the cake, or rather the copers on the wall. I'm quite surprised that I have built most of the structure using stone that was already at the property; all I needed to acquire was the faced stone (including the pintle blocks for the gate hinges) which forms the quoin. I was pleased that it was pretty level for the coping stones to be laid, and also when I made a small framework to lie on the top I proved that it was pretty well parallel as well. I used this to draw a line showing the width of the coping stones and, hence, where I needed to grind an angle on the (few) protruding bits. There is a bend in the wall - I didn't want to make this too easy for myself! - and of course I had forgotten about the coping stones when I designed the bend. This bend was required because I didn't want to uproot the ivy climbing up the boundary wall, which would have been necessary if the new wall had been straight. Another difficulty was that the soil rises in the direction of the boundary wall, so the foundations required a lot of thought.
Today I hired an angle grinder again [Top Tip: buy your own blade if you think you'll hire one more than once] and spent the morning cutting and grinding in preparation for the afternoon when my son arrived (with grandson) to help with the difficult bit - lifting the copers carefully into position on their mortar bed. Since the heaviest weighs about 45kg, you can imagine that I had quickly decided that this was too much for me. I made a mix of NHL (sharp sand: building sand: NHL3.5 in 5:1:2 ratio). This is basically standard 3:1 but I added the local building sand which gives a good colour match to the house pointing. My grandson loved the mixer but was otherwise confined indoors as I had to wield the grinder again to make the last coping stones fit.
However, in my haste I made too much mortar and so after my son left I spent the next three hours doing pointing and minor repairs to use it up; I gave up when it started to rain as dusk was falling.I'm pretty pleased with the result. A lot of thought has gone into this wall; I find that things usually turn out better if you think long and hard before you start, and try to imagine exactly how things will be done and what problems might ensue. (There have also been a few sleepless nights.) My vision was to build a security wall which would look as though it had been there for years, and I'd like to think that I have succeeded. However, I'm glad I'm not doing that for a living - I started in May and thought it would be done by early July!
Subscribe to:
Posts (Atom)





