Well, it's really time to celebrate, as I have just finished a complete renovation of the last sash window on my house! There were seven sashes on the house and in the restoration of the house we added two more - one in the rebuilt extension and one in the kitchen replacing a Crittal door (where there used to be a large sash); of the existing seven, one was a complete renewal job (the large venetian sash at the front bay) as it was too far gone. I did the first of the other six in 2015, followed by two more in both 2016 and 2017, leaving just the one. I deliberately started with the largest and then the next four were all pretty well the same size, leaving the smallest to last. I'm glad I did this, as I used two larger damaged pieces of glass in the last window, and got them cut to size; one I had managed to crack on removal (grrrr.....), and the other was newer, thicker and not wavy, so having the wavy glass available it was a no-brainer to replace it. BTW, if you want to see the effect of wavy glass, hold it in sunshine and look at the image on the ground - this is why it is valuable.
The window concerned was the front window with two lights, both just one over one, separated by a cement mullion on the outside; this window is for the bathroom/loo upstairs. The top pane on each side is a rectangle with a half round at the top, and I checked with my glass supplier that he was able to cut such a shape (just in case I broke one) but in fact both those came out OK. The top pane on each side was a fixed window, lacking pulleys and cord, and in fact some of it was unpainted - obviously it had been installed unpainted, so had probably never been removed in 150 years.
All my sash windows have needed a complete renovation. All of the latches were solid and unusable, all the pullies except one* were worn out, with huge gaps between the spindle and the housing, most windows were painted in solidly, the bottom half of the putty was usually falling out, and only about six cords were intact out of 24. So the complete renovation involves removing all glass and brass, strip to bare wood, repair
as required, paint, fit same glass with fresh putty and refit with new
cord, new pulleys and new latches.
I had one issue as three of the weights were locally cast lead (2.1 lb) and one was a standard 6.5 lb iron one, just like the rest on the house. The issue I had was that I could not get the iron one out easily. Eventually it came when I worked out a way of levering it out longitudinally, forcing the gap apart a bit. When it came to re-instating the window, I made a new one out of lead sheet, wrapped around a long plated screw. This was made at the same weight as the others, because I was using the correct thickness of glass; the 6.5 lb was serious overkill by some repairer in the past - that one weight was more than the required weight of two, and of course being on the one side it meant that the window would always have been sticking by being unevenly weighted.
By now I have got a good idea of how to do this job but even so I reckon that each complete window takes about 30 man-hours and an elapsed time of almost two weeks. Although this last window was smaller and one over one (all the others were two over two, with two frames), it is a double window with four frames so took me just as long as the larger ones.
So, this last window is basically done but I just need to re-instate the pointing and sort out the cills; I think I'll leave that for a couple of weeks time. I'll offer free advice on Victorian sashes but I hope I don't have to ever do another. Now, I have work to do on the church opposite in August, so I expect little more will happen on the house this year - the tiles in the hall floor are just about the last major job on the list.
* and that was only found serviceable after I had wrecked the face plate in getting it out!
This is the story of the purchase and renovation of Matthew & Jane's house somewhere in the heart of England, following Matthew’s redundancy in 2010 at the age of 58. Said to be from c.1835, we first saw it in Aug 2010. It had been empty for only a few weeks but was pretty awful due to dampness and long term neglect. Locals thought it had been uninhabited for years and was only fit for demolition! But we bought it anyway and moved in after 8 months work in July 2011.
Sunday, 15 July 2018
Saturday, 23 December 2017
Another End of Year Review
One good thing about a blog like this is that it helps me keep track of what I have achieved with this house and, possibly more importantly, what I have NOT achieved! Hence this end of year review is largely for my own benefit.
Frankly, I don't feel I've done much here in 2017. I did accomplish the previously reported refurbishment of the two remaining large sash windows - both hard work but very satisfying to see (and feel the benefit of reduced draughts). I also managed to repair the corner of a back wall where many stones were loose - I was worried that if my neighbour's side was as bad then the wall might collapse but, fortunately, his side was better anyway. The rest of the list from earlier this year is still outstanding.
There has also been a lot of clearing out in the second bedroom where I have made a wardrobe. This clearing task was made much easier after August as our daughter's wonderful wedding dress was used for its intended purpose and now lives at her house. Otherwise my shed is now full of stuff from my Dad's house that I would like to use, restore or sell - that last task seems to be a lot more work than one might think. I have not done much in the garden except to keep it tidy; I was really annoyed when the people at the back started to cut the ivy on my back wall - I asked them to leave as much as they could as it breaks up the appearance of the wall and adds some privacy, as well as giving food and shelter for birds.When they finished, it looked the same on my side, but on their side they had given the bit on top of the wall a short back and sides - the vertical wall was totally clear and so all the ivy on top had been cut off from its roots! Sigh.
It might be considered that I must have been lying around doing nothing this year, but this is definitely not the case. Leisure wise, I have bought a one-tenth share in a small aeroplane which is older than I am, and refreshed my private pilot's licence, so there is a bit of flying to look forward to in 2018.
At the church, we have done a £250k job on the exterior, thanks to a grant from the Heritage Lottery Fund. In the course of this work we suffered some vandalism when some little sod got up the partially completed scaffolding before the alarm was fitted and literally kicked a couple of stained glass windows to pieces - this repair should be complete at last in early January. You can hardly imagine how much work is caused by an incident like that, and most of it fell on my shoulders.
That reminds me of something that I need to pass on about the erection of scaffolding. It appears to be customary trade practice not to fit a scaffolding alarm until the erection of the scaffolding is finished. Now, I can understand why that should be the case for scaffolding around a house, as the alarm will get in the way of the next day's erection work. However, when you are putting up 13 lifts of scaffolding around a church tower, the job will take several days so I cannot understand why the alarm cannot be fitted once you have done the first three or four lifts, as all subsequent work will be above the alarm. If I was the insurers I would be insisting on a change to the current practice, but fortunately they are paying (apart from our excess)...
At one stage recently, one of the two temporary plastic sheets fell out of the window and made everyone very cold for one weekend. To fix this, I hired a 7.2 metre double width scaffold tower which was erected and dismantled by me and two men of similar age. To my surprise, I found that the double width tower was no more difficult to erect
and, in fact, the platforms were easier to manage, so I will use one of these in future. The window job itself took only 25 minutes and our end result is much more secure than that of the professionals who fitted the stuff.
This year we have had a cruise from Jordan to Malaga through the Suez Canal, seeing Petra in Jordan and calling at Crete, Malta, Palma and Gibraltar; we also spent a week in Sicily in September, so we have done OK for holidays. (NB From our cruise we flew back from Malaga and had the most dreadful airport experience of our lives - don't go there! If it's a bad as that on a Sunday in early April, what was it like in August?)
We have become used to being in each other's company for most of the day, almost every day, now that we are both properly retired, and I expect to end my six years as Churchwarden in May 2018, so I will then have even more time on my hands.
Frankly, I don't feel I've done much here in 2017. I did accomplish the previously reported refurbishment of the two remaining large sash windows - both hard work but very satisfying to see (and feel the benefit of reduced draughts). I also managed to repair the corner of a back wall where many stones were loose - I was worried that if my neighbour's side was as bad then the wall might collapse but, fortunately, his side was better anyway. The rest of the list from earlier this year is still outstanding.
There has also been a lot of clearing out in the second bedroom where I have made a wardrobe. This clearing task was made much easier after August as our daughter's wonderful wedding dress was used for its intended purpose and now lives at her house. Otherwise my shed is now full of stuff from my Dad's house that I would like to use, restore or sell - that last task seems to be a lot more work than one might think. I have not done much in the garden except to keep it tidy; I was really annoyed when the people at the back started to cut the ivy on my back wall - I asked them to leave as much as they could as it breaks up the appearance of the wall and adds some privacy, as well as giving food and shelter for birds.When they finished, it looked the same on my side, but on their side they had given the bit on top of the wall a short back and sides - the vertical wall was totally clear and so all the ivy on top had been cut off from its roots! Sigh.
It might be considered that I must have been lying around doing nothing this year, but this is definitely not the case. Leisure wise, I have bought a one-tenth share in a small aeroplane which is older than I am, and refreshed my private pilot's licence, so there is a bit of flying to look forward to in 2018.
At the church, we have done a £250k job on the exterior, thanks to a grant from the Heritage Lottery Fund. In the course of this work we suffered some vandalism when some little sod got up the partially completed scaffolding before the alarm was fitted and literally kicked a couple of stained glass windows to pieces - this repair should be complete at last in early January. You can hardly imagine how much work is caused by an incident like that, and most of it fell on my shoulders.
That reminds me of something that I need to pass on about the erection of scaffolding. It appears to be customary trade practice not to fit a scaffolding alarm until the erection of the scaffolding is finished. Now, I can understand why that should be the case for scaffolding around a house, as the alarm will get in the way of the next day's erection work. However, when you are putting up 13 lifts of scaffolding around a church tower, the job will take several days so I cannot understand why the alarm cannot be fitted once you have done the first three or four lifts, as all subsequent work will be above the alarm. If I was the insurers I would be insisting on a change to the current practice, but fortunately they are paying (apart from our excess)...
At one stage recently, one of the two temporary plastic sheets fell out of the window and made everyone very cold for one weekend. To fix this, I hired a 7.2 metre double width scaffold tower which was erected and dismantled by me and two men of similar age. To my surprise, I found that the double width tower was no more difficult to erect
and, in fact, the platforms were easier to manage, so I will use one of these in future. The window job itself took only 25 minutes and our end result is much more secure than that of the professionals who fitted the stuff.
This year we have had a cruise from Jordan to Malaga through the Suez Canal, seeing Petra in Jordan and calling at Crete, Malta, Palma and Gibraltar; we also spent a week in Sicily in September, so we have done OK for holidays. (NB From our cruise we flew back from Malaga and had the most dreadful airport experience of our lives - don't go there! If it's a bad as that on a Sunday in early April, what was it like in August?)
We have become used to being in each other's company for most of the day, almost every day, now that we are both properly retired, and I expect to end my six years as Churchwarden in May 2018, so I will then have even more time on my hands.
Tuesday, 8 August 2017
Sash Window Surprise and Mystery
Yesterday I started to tackle the complete renovation of the last large 2 over 2 sash window
in the house - this one is in the hall (photo right), and there are still two small sashes in the bathroom to be done but they are one over one, so they hardly count. (NB The front door is at right angles to the window, behind the wall to the right.)
Now, the weather this August has not been too good, and this week is no exception. Having identified this as the last two week period this year when the job could be done, I started yesterday but didn't get very far in that weather. In fact it was pretty depressing as, having been pretty successful in removing the old glass on the four similar windows which I have renovated in the last two years, yesterday I broke three panes on only the one sash. Now, since the window is 2 over 2, by definition one sash has only two panes - I broke both those and, in seeing if a spare piece of glass from a previous window would fit, I broke that too! However, today was better. I got both wavy panes out of the top sash unbroken, and also stripped both sashes to bare wood, including getting all the putty out.
The surprise was the discovery that the top sash has never been a moving window. It has no pulleys and weights, nor even an attachment point for any cords.
The mystery is that although it was quite difficult to get the top sash out, this was entirely
due to the fact that it had been generously painted in on several occasions - there was no other visible attachment holding it in place. No screws, no nails, no wedge, nothing. How did they do that?
Left is a picture showing the pulley for the lower sash and an unpainted piece of wood with no hole where it should be for the pulley for the upper sash!
Fortunately, when trying to free the upper sash with a Stanley knife, I was well aware that there might be no cords holding it, so I did the job very carefully. I was most relieved when I had it in my hands complete and undamaged, and even more pleased when I had both panes out safely an hour later.
Edit following completion of the task: Mystery solved! The top sash was originally held up by a pair of very fine nails - basically long panel pins - which were nailed upwards at an angle of 45 degrees at the bottom of each vertical part of the sash frame. These of course were ferrous and so had rusted away a long time ago; it took me a long while before I found the traces of the tiny rusty holes as I knew they had to be there somewhere!
I am very pleased to have had the whole window repainted, reassembled and working on the eighth day of this project; it took about 30 manhours and looks pretty good. I didn't bother to even take any photos of the stages as it was just the same as the earlier ones, apart from the fixed window. Now all I have left are two small one over one sashes which form the bathroom window - that's a project for next year.
in the house - this one is in the hall (photo right), and there are still two small sashes in the bathroom to be done but they are one over one, so they hardly count. (NB The front door is at right angles to the window, behind the wall to the right.)Now, the weather this August has not been too good, and this week is no exception. Having identified this as the last two week period this year when the job could be done, I started yesterday but didn't get very far in that weather. In fact it was pretty depressing as, having been pretty successful in removing the old glass on the four similar windows which I have renovated in the last two years, yesterday I broke three panes on only the one sash. Now, since the window is 2 over 2, by definition one sash has only two panes - I broke both those and, in seeing if a spare piece of glass from a previous window would fit, I broke that too! However, today was better. I got both wavy panes out of the top sash unbroken, and also stripped both sashes to bare wood, including getting all the putty out.
The surprise was the discovery that the top sash has never been a moving window. It has no pulleys and weights, nor even an attachment point for any cords.
The mystery is that although it was quite difficult to get the top sash out, this was entirely
due to the fact that it had been generously painted in on several occasions - there was no other visible attachment holding it in place. No screws, no nails, no wedge, nothing. How did they do that?
Left is a picture showing the pulley for the lower sash and an unpainted piece of wood with no hole where it should be for the pulley for the upper sash!
Fortunately, when trying to free the upper sash with a Stanley knife, I was well aware that there might be no cords holding it, so I did the job very carefully. I was most relieved when I had it in my hands complete and undamaged, and even more pleased when I had both panes out safely an hour later.
Edit following completion of the task: Mystery solved! The top sash was originally held up by a pair of very fine nails - basically long panel pins - which were nailed upwards at an angle of 45 degrees at the bottom of each vertical part of the sash frame. These of course were ferrous and so had rusted away a long time ago; it took me a long while before I found the traces of the tiny rusty holes as I knew they had to be there somewhere!
I am very pleased to have had the whole window repainted, reassembled and working on the eighth day of this project; it took about 30 manhours and looks pretty good. I didn't bother to even take any photos of the stages as it was just the same as the earlier ones, apart from the fixed window. Now all I have left are two small one over one sashes which form the bathroom window - that's a project for next year.
Friday, 19 May 2017
Plan for the Year
It might seem a bit late to be making a plan for the year in mid-May, but nearly everything I need to do is either outside or requires me to make frequent trips outside, and so the weather has been beating me. Right now I am feeling defeated as the forecast was for some cloud, clearing to the east, followed by scattered cloud with possibility of rain; we have actually had overcast cloud with drizzle for the entire day, punctuated by two half hour fool's breaks (you know, when you think you can do something and start, only for the rain to start again).
Anyway, there are jobs to be done and the first is to make a list:
a. Sash windows - two large ones are left to be refurbished, and there is a smaller pair in the bathroom. Hopefully I will get at least the two large ones done this year - one is in the kitchen and the other is in the hall (but there is also some remedial work to do on one of last year's where some putty has slipped).
b. Plastering - I need to do the inset bit at the top of the hall window which is hanging, albeit still complete, plus the three inset bits around the main bedroom window. These bits were all not done in 2010/11 as they looked OK then, but they are showing signs of wear around the edges!
c. Garden walls - I have been doing some repairs to two of the garden walls, and this could continue for ages as they are in pretty poor condition. In many cases I have to remove several stones and carefully remortar them (with NHL3.5) so that they are set solid before I do the next bit above. There is also the front (side) garden wall which I found last year was bowing horribly towards my neighbour's garden - and it is about 10' high, so that's quite a worry. However, that rebuild won't happen this year...
d. The back garden needs lots of tidying where the residue of 2011's work is still apparent, and there's still some ground elder to dig up carefully.
e. Redecoration - I think that 'Er Indoors wants some redecoration in at least one of the back bedrooms and, possibly, the lounge.
I have done some things this year - the wardrobe in a back bedroom was completed back in February, which has allowed a rearrangement of the stuff in our main wardrobe. As another consequence, we have been able to dispose of some items of furniture.
I have also been helping my next elder brother and both my sisters to tidy our parents' house. Mum died in 2015 and Dad is now in a carehome with vascular dementia; at 95, clearly he will not be going home again. I think the house will need to be sold by early next year to pay for the carehome which is really quite expensive. As part of clearing that house in London I have occasionally brought things back home for disposal or sale - such items always take priority over mere house jobs and selling things on eBay is actually quite time-consuming, I think.
The major change this year is that my other half has retired from full-time work. This has been quite an adjustment for both of us, as I had been so used to her disappearing early in the day and arriving back much later in time for an evening meal (made by me); this routine allowed me to work out the day for myself as I wanted, but suddenly there is someone else wanting to use the car, or the bathroom, or whatever room I wanted to work in etc. You get the picture!
I've been retired for nearly seven years now, and haven't really stopped until the last year or so - at last, this is what retirement is really like?
Anyway, there are jobs to be done and the first is to make a list:
a. Sash windows - two large ones are left to be refurbished, and there is a smaller pair in the bathroom. Hopefully I will get at least the two large ones done this year - one is in the kitchen and the other is in the hall (but there is also some remedial work to do on one of last year's where some putty has slipped).
b. Plastering - I need to do the inset bit at the top of the hall window which is hanging, albeit still complete, plus the three inset bits around the main bedroom window. These bits were all not done in 2010/11 as they looked OK then, but they are showing signs of wear around the edges!
c. Garden walls - I have been doing some repairs to two of the garden walls, and this could continue for ages as they are in pretty poor condition. In many cases I have to remove several stones and carefully remortar them (with NHL3.5) so that they are set solid before I do the next bit above. There is also the front (side) garden wall which I found last year was bowing horribly towards my neighbour's garden - and it is about 10' high, so that's quite a worry. However, that rebuild won't happen this year...
d. The back garden needs lots of tidying where the residue of 2011's work is still apparent, and there's still some ground elder to dig up carefully.
e. Redecoration - I think that 'Er Indoors wants some redecoration in at least one of the back bedrooms and, possibly, the lounge.
I have done some things this year - the wardrobe in a back bedroom was completed back in February, which has allowed a rearrangement of the stuff in our main wardrobe. As another consequence, we have been able to dispose of some items of furniture.
I have also been helping my next elder brother and both my sisters to tidy our parents' house. Mum died in 2015 and Dad is now in a carehome with vascular dementia; at 95, clearly he will not be going home again. I think the house will need to be sold by early next year to pay for the carehome which is really quite expensive. As part of clearing that house in London I have occasionally brought things back home for disposal or sale - such items always take priority over mere house jobs and selling things on eBay is actually quite time-consuming, I think.
The major change this year is that my other half has retired from full-time work. This has been quite an adjustment for both of us, as I had been so used to her disappearing early in the day and arriving back much later in time for an evening meal (made by me); this routine allowed me to work out the day for myself as I wanted, but suddenly there is someone else wanting to use the car, or the bathroom, or whatever room I wanted to work in etc. You get the picture!
I've been retired for nearly seven years now, and haven't really stopped until the last year or so - at last, this is what retirement is really like?
Friday, 13 January 2017
More New Year Resolutions
I have found making resolutions beneficial in the last few years - at least by writing my intentions at the start of the year, I then cannot deny what I wrote! Also, it helps my failing memory about what I intended to do, and then what I actually achieved (and when).
The most momentous event of the year was that t'other half finally retired and so no longer travels to London each weekday; we are still trying to work out how to exist together for seven days per week, when for the last six years I have been accustomed to being on my own (and doing the shopping and cooking) for five of those days. We have already learned the benefits of not waking at 6.15am, and are still catching up on years of lost sleep!
Last year I did achieve most of my intentions:
a. The hall landing and stairs were painted in the Earthborn claypaint
b. I stripped, repaired and repainted one half of the back gates
c. I managed to renovate two more sash windows (the back bedrooms)
d. I installed a wardrobe in the second bedroom, using the doors and frame given to me by the neighbour who was throwing them out - I'm very pleased with the result
e. I built a second wood-store and also did a couple of similar jobs in the church
However, I still have the following to do this year:
1.There is still some plastering to do: the window recess in the front bedroom is some of the last original plaster left, and it doesn't sound good.
2. In painting the hall I found that the plaster in the top of the hall window recess was dropping down and so needs to be re-done as well, with lime plaster. It would make sense to do both 1 and 2 at the same time but that will make a mess in two places at the same time, and the job will want three or four coats with drying time between.
3. The wardobe in the front bedroom needs plastering (modern stuff - it's panelled with plasterboard).
4. I still want to put fire black on some fireplaces - I've never done that before and feel that it could be messy!
5. There are still two more of the same size sash windows (hall and kitchen) to do, plus the pair of small ones in the bathroom.
6. One very new job is that the high stone wall (between our neighbour's back garden and our front) needs to be rebuilt - it is about 8 feet high on my side, and about 10 feet on my neighbour's, due to the difference in ground levels. It has a lot of ivy damage and also leans alarmingly. I think I will get it done by a professional...
We have our daughter's wedding to look forward to in August, and have also booked a cruise from Aqaba to Spain just before Easter. Somehow I don't think the year is going to hang around!
The most momentous event of the year was that t'other half finally retired and so no longer travels to London each weekday; we are still trying to work out how to exist together for seven days per week, when for the last six years I have been accustomed to being on my own (and doing the shopping and cooking) for five of those days. We have already learned the benefits of not waking at 6.15am, and are still catching up on years of lost sleep!
Last year I did achieve most of my intentions:
a. The hall landing and stairs were painted in the Earthborn claypaint
b. I stripped, repaired and repainted one half of the back gates
c. I managed to renovate two more sash windows (the back bedrooms)
d. I installed a wardrobe in the second bedroom, using the doors and frame given to me by the neighbour who was throwing them out - I'm very pleased with the result
e. I built a second wood-store and also did a couple of similar jobs in the church
However, I still have the following to do this year:
1.There is still some plastering to do: the window recess in the front bedroom is some of the last original plaster left, and it doesn't sound good.
2. In painting the hall I found that the plaster in the top of the hall window recess was dropping down and so needs to be re-done as well, with lime plaster. It would make sense to do both 1 and 2 at the same time but that will make a mess in two places at the same time, and the job will want three or four coats with drying time between.
3. The wardobe in the front bedroom needs plastering (modern stuff - it's panelled with plasterboard).
4. I still want to put fire black on some fireplaces - I've never done that before and feel that it could be messy!
5. There are still two more of the same size sash windows (hall and kitchen) to do, plus the pair of small ones in the bathroom.
6. One very new job is that the high stone wall (between our neighbour's back garden and our front) needs to be rebuilt - it is about 8 feet high on my side, and about 10 feet on my neighbour's, due to the difference in ground levels. It has a lot of ivy damage and also leans alarmingly. I think I will get it done by a professional...
We have our daughter's wedding to look forward to in August, and have also booked a cruise from Aqaba to Spain just before Easter. Somehow I don't think the year is going to hang around!
Wednesday, 26 October 2016
Repairs to Large Stone Wall
I
have a new neighbour - not the other half of my semi-detached house but the other
side. Their house has a door onto the pavement, whereas my house is set back 15 metres, with the result that there is a wall between my front garden and their back garden. They have done a phenomenal amount of work on their place in a
very short space of time (mostly based on the right principles). One
of the things they have done was to remove the huge amount of ivy on
this 16" thick limestone wall which, sadly, has revealed that the wall is not in as
good a condition as I thought.
The wall is of a mixed construction being partly coursed random rubble and partly roughly
squared - see photo (the bin is just there to give an idea of scale). Where it was clear of ivy (left of picture) there are mostly blocks with good pointing, which is why I thought the whole thing was in good condition; however, much of the rest is coursed random rubble. The whole is capped by 3" limestone slabs, 16" wide and about 30" long; these seem to have been set with a small slope for drainage. Now that the ivy is largely cleared (the darker area where the ladder is), it is apparent that the coursed random rubble is in pretty poor condition with loose or missing mortar, ivy penetrating the wall and loose stones in the first couple of feet down from the top.
The wall starts off pretty vertical (where it leaves the neighbours' house, out of the left side of the above picture) but moving away from the house it has a bow which means that the natural taper has become vertical on their side and a quite marked slope on mine. The top looks awful (left photo) but it's not possible to say what the original slope of the coping was; it has certainly increased a lot in places, but I don't have an clinometer so I can't measure it.
The trouble is that the
wall is pretty big. My side is about 8 ft high, and their garden is
probably about 3 ft lower than mine (as my garden slopes up and theirs is level throughout), so they have an 11ft wall towering
over their patio. A major rebuild is definitely needed; legally I think
it's their wall, but it's my ivy. Both houses are listed and in a
conservation area. A like-for-like repair does not need LBC but, as it's so high, I'll find
someone more experienced to do it for me, rather than do it myself as next year's project. I
wouldn't want the responsibility if it fell over later.
I've had a builder look at it and his view is that the bow means that the top has moved over a foot out of true, which is a lot, and so it looks as though the neighbours and I will have a discussion about this with a view to rebuilding the top few feet sometime next spring!
I've had a builder look at it and his view is that the bow means that the top has moved over a foot out of true, which is a lot, and so it looks as though the neighbours and I will have a discussion about this with a view to rebuilding the top few feet sometime next spring!
Friday, 22 July 2016
The Year is half over
It seems hardly possible that we are now in the second half of the year. How time flies! How the world has changed so much in a short time! How much have I done to the house? What more will I achieve in the remainder of the year?
We've now been here for five years, and that hardly seems credible either. I first saw this house at the start of August 2010, and it immediately spoke to me. Moreover, I knew that it would speak to my other half as well - she has the vision (so often lacking in those TV property programmes!) to look past the defects and the undergrowth, and to see what a place could be. We never had any real doubt that this was the place for us, and I can still recall the evening of the day we moved in - we shared a wonderful sense of peace and satisfaction that this was OUR HOME, in every sense of the phrase (despite the boxes, mess and work still outstanding).
Back to my questions above. Firstly, I have been mentioning about the internal doors since 2012 (when I did the door from the kitchen to the new extension); in 2013 I started on the three doors in the hall (filter on "decorating" or "doors" to find these posts) These are the original doors with four recessed rectangles, the upper pair being slightly larger; the doors were covered with some revolting brown stuff which gummed up sandpaper in two strokes and was eventually removed with a three handed operation involving a hot air gun, a scraper and a Stanley knife; the knife had to be used after every stroke to remove the molten globule from the scraper, otherwise the next stroke would leave as much as it removed. I managed this by holding both the heat gun and the Stanley knife in my left hand, at the expense of a slight strain to the thumb!
Compounding the difficulty of the brown gunk, both sides of the lounge door and one side of the kitchen door have a moulding around each of the four rectangles, which made removal of the gunk even more onerous. There was also the architrave around both sides of the kitchen door - I confess that in 2015 I gave in and replaced the architrave around the lounge door (which had been split on one side in earlier works although I forget exactly how).
Anyway, I stuck at the removal task and had done the two main doors by last autumn. Remaining was the door to the cupboard under the stairs, which I did in February this year. The nice touch on this one was to add a bit of architrave above it, which has improved the look considerably. They are finished in eggshell eau-de-nil which looks really good with the gentle yellow of the claypaint walls.
Secondly, I determined that there were some jobs for which I just had to bite the bullet, namely the sash windows. I did one (the largest and most complicated!) last year, and soon I'll post a detailed report on the ones I have done this year. Once again, my choice of window was thwarted - t'other half wanted me to start with the other bedrooms, and I wanted to do the bathroom small pair at the front. Anyway, the pretty large sash in both bedrooms is now complete and they really do look better. I estimated last year that the first one took me 60 hours; both these are not quite as large and have one glazing bar less, and took me about 40 hours each.
I have also built a second wood store outside, and have tackled a few of those little jobs that one puts off, like the bit of stone on the front corner which was missing (as someone had indented a bit of wood from the gate frame into the wall! WHY?). There remains for this year the two small sash windows in the bathroom, some lime plastering around two recessed windows and a new wardrobe in the second bedroom; that will leave just two sashes for next year. Perhaps then I will have to find new ways of enjoying my retirement!
We've now been here for five years, and that hardly seems credible either. I first saw this house at the start of August 2010, and it immediately spoke to me. Moreover, I knew that it would speak to my other half as well - she has the vision (so often lacking in those TV property programmes!) to look past the defects and the undergrowth, and to see what a place could be. We never had any real doubt that this was the place for us, and I can still recall the evening of the day we moved in - we shared a wonderful sense of peace and satisfaction that this was OUR HOME, in every sense of the phrase (despite the boxes, mess and work still outstanding).
Back to my questions above. Firstly, I have been mentioning about the internal doors since 2012 (when I did the door from the kitchen to the new extension); in 2013 I started on the three doors in the hall (filter on "decorating" or "doors" to find these posts) These are the original doors with four recessed rectangles, the upper pair being slightly larger; the doors were covered with some revolting brown stuff which gummed up sandpaper in two strokes and was eventually removed with a three handed operation involving a hot air gun, a scraper and a Stanley knife; the knife had to be used after every stroke to remove the molten globule from the scraper, otherwise the next stroke would leave as much as it removed. I managed this by holding both the heat gun and the Stanley knife in my left hand, at the expense of a slight strain to the thumb!
Compounding the difficulty of the brown gunk, both sides of the lounge door and one side of the kitchen door have a moulding around each of the four rectangles, which made removal of the gunk even more onerous. There was also the architrave around both sides of the kitchen door - I confess that in 2015 I gave in and replaced the architrave around the lounge door (which had been split on one side in earlier works although I forget exactly how).
Anyway, I stuck at the removal task and had done the two main doors by last autumn. Remaining was the door to the cupboard under the stairs, which I did in February this year. The nice touch on this one was to add a bit of architrave above it, which has improved the look considerably. They are finished in eggshell eau-de-nil which looks really good with the gentle yellow of the claypaint walls.
Secondly, I determined that there were some jobs for which I just had to bite the bullet, namely the sash windows. I did one (the largest and most complicated!) last year, and soon I'll post a detailed report on the ones I have done this year. Once again, my choice of window was thwarted - t'other half wanted me to start with the other bedrooms, and I wanted to do the bathroom small pair at the front. Anyway, the pretty large sash in both bedrooms is now complete and they really do look better. I estimated last year that the first one took me 60 hours; both these are not quite as large and have one glazing bar less, and took me about 40 hours each.
I have also built a second wood store outside, and have tackled a few of those little jobs that one puts off, like the bit of stone on the front corner which was missing (as someone had indented a bit of wood from the gate frame into the wall! WHY?). There remains for this year the two small sash windows in the bathroom, some lime plastering around two recessed windows and a new wardrobe in the second bedroom; that will leave just two sashes for next year. Perhaps then I will have to find new ways of enjoying my retirement!
Monday, 4 January 2016
Another Year
Another year starts and so it's time to review what I've done on the house and what I intend to do this year!
I did do a couple of things not listed in the last progress update last June or the end of year update immediately below this entry:
a. The hall landing and stairs were painted in the Earthborn claypaint and look lovely - I do recommend this stuff, but to get the best result you need to roll it rather than brush it.
b. I stripped, repaired and repainted one half of the back gates - as they are from different sources they wear differently, and the one half that I had renovated in 2011 was looking quite poorly. I think this was because it wasn't actually as dry as I thought then.
Now, in the coming year, there are a few big-ish jobs left:
1. The big question is how many sash windows I will renovate. My plan is to do at least the narrow pair in the bathroom, followed by the one in the hall. That will leave one in the kitchen and two in the back bedrooms.
2. There is also some plastering to do: the window recess in the front bedroom is some of the last original plaster left, and it doesn't sound good. Having done the window last year, it makes sense to tackle this tricky bit of work.
3. In painting the hall I found that the plaster in the top of the hall window recess was dropping down and so needs to be re-done as well, with lime plaster. It would make sense to do both 2 and 3 at the same time but that will make a mess in two places at the same time, and the job will want three or four coats with drying time between.
4. The wardobe in the front bedroom needs plastering (modern stuff - it's panelled with plasterboard).
5. I want to install a wardrobe in the second bedroom, but that means that I have to sort out a full four drawer filing cabinet and other stuff...
6. I'd like to put fire black on some fireplaces - I've never done that before and feel that it could be messy!
7. Then there's more decorating and other internal jobs, plus more tidying in the garden - but these all count as maintenance.
Other than those, we have a cruise holiday booked in March and we're going to a square dance convention for three days in July. Moreover the church is not doing any major work this year as our current grant application is for 2017, so it might be a more relaxed year!
http://www.heyfordhoofers.org.uk/
I did do a couple of things not listed in the last progress update last June or the end of year update immediately below this entry:
a. The hall landing and stairs were painted in the Earthborn claypaint and look lovely - I do recommend this stuff, but to get the best result you need to roll it rather than brush it.
b. I stripped, repaired and repainted one half of the back gates - as they are from different sources they wear differently, and the one half that I had renovated in 2011 was looking quite poorly. I think this was because it wasn't actually as dry as I thought then.
Now, in the coming year, there are a few big-ish jobs left:
1. The big question is how many sash windows I will renovate. My plan is to do at least the narrow pair in the bathroom, followed by the one in the hall. That will leave one in the kitchen and two in the back bedrooms.
2. There is also some plastering to do: the window recess in the front bedroom is some of the last original plaster left, and it doesn't sound good. Having done the window last year, it makes sense to tackle this tricky bit of work.
3. In painting the hall I found that the plaster in the top of the hall window recess was dropping down and so needs to be re-done as well, with lime plaster. It would make sense to do both 2 and 3 at the same time but that will make a mess in two places at the same time, and the job will want three or four coats with drying time between.
4. The wardobe in the front bedroom needs plastering (modern stuff - it's panelled with plasterboard).
5. I want to install a wardrobe in the second bedroom, but that means that I have to sort out a full four drawer filing cabinet and other stuff...
6. I'd like to put fire black on some fireplaces - I've never done that before and feel that it could be messy!
7. Then there's more decorating and other internal jobs, plus more tidying in the garden - but these all count as maintenance.
Other than those, we have a cruise holiday booked in March and we're going to a square dance convention for three days in July. Moreover the church is not doing any major work this year as our current grant application is for 2017, so it might be a more relaxed year!
http://www.heyfordhoofers.org.uk/
Sunday, 4 October 2015
Finishing the Summer's Work
Firstly, here's a picture of the finished sash window (upper left window in the picture right). It was a lot of work - probably more than 60 man-hours - but it was worth it simply for the satisfaction of a job well done, plus the appreciation of t'other half!
As I said in August, I'd like to think that the finish on my window is better than the (not so long ago professionally refurbished) window of my neighbour (upper right). Certainly mine was cheaper and still has the glass that it had when I bought it (although two large panes are not original wavy glass).
Apart from the sash window, I have also done the garden (right) along the
side of the house. This is the bit seen from the kitchen window, so it
was really good to get it done before winter.Having moved half a ton of earth from front to back, the side garden was ready for some turf which I acquired from a well known home store. The bit recently done is in front of the shed up to the brick wall. The turf didn't cost the full price as it was quite yellow but, having been down for ten days, it is now indistinguishable in colour from the stuff laid earlier (in three separate phases!) which stretches to the back wall in the distance. NB The grass ramp is to allow me to push the mower up (as the same mower has to do this raised lawn and the front lawn) - I could lift it up now but know that one day soon it will become impossible for me!
I needed a small
amount of top soil to sort out the levels of the last turf beside the shed; this was planned to come from
laying a bit more driveway in front but this job just didn't get done
for ages until happily it all happened suddenly a few weeks ago. The new space (left) is only a small addition but I didn't want to loose too much of the lawn out front. It allows much easier turning of cars in front, as well as a bit more parking when the family visit.On the left is the view from the back of the garden looking along the side of the house. The back gates still need some work but otherwise now everything is just gardening rather than earth-moving, brickwork or stone work. As my wife said, "you did all of that yourself!"
Compare this view with the next picture below, which was taken from pretty well the very same spot.
Here's a couple of reminders of what it looked like just before we bought it:
Firstly (right upper), looking forward from beside the kitchen, from the far end looking forward to where the back gates and my "repaired" wall now are (where the green bin is in the picture):
Secondly (right lower), the view looking to the rear from beside what is now the kitchen window:
The tree (visible in both pictures) beside the wall of the house was a lovely pear tree which sadly had to go. It was so close to the house that a chain saw could not fit between the tree and the wall, but a woodturner friend managed to fell it for me (in exchange for the wood!). Note the concrete path (along the side of the house) which was about six inches above the floor level inside, whereas my black limestone slabs are five inches below the same floor level.
At the time these photos were taken, we had not actually found the side wall of the garden (somewhere to the left of the bottom photo) as the undergrowth was so thick! Eventually (about three months later), to our surprise, we found that the garden widens out as you go back (and our neighbour's garden narrows) - I think it is because it follows a boundary along a mediaeval street, which predated both houses!
Wednesday, 16 September 2015
Serious Damp Issues
I've just returned from a short holiday in Venice - we had never been there before and it seemed like a good place to tick off our list of "must-do somewhen". The whole place is
fascinating, and it really takes a visit to understand how this small island (or rather a set of smaller islands) is set in a large lagoon with other inhabited islands around. Much of the lagoon is very shallow and so is un-navigable by everything except the smallest boats, and it is not clear to the eye whether the sea is taking back the land, or the land is being reclaimed from the sea! Probably a bit of both, I fancy.
The Venetians have not helped their predicament by allowing very large ships to dock on the north side of the main island, i.e. the side furthest from the Adriatic Sea. To accomodate these 100,000 tonne monsters (each with over 5,000 passengers!) they require to keep the waterway past St Mark's Square dredged to about 50 feet, which surely cannot help but encourage the town itself to settle gently? We were told that most houses are so damp that the ground floor is not used, and there is often as little as a foot difference between the water and ground that we walked on!
Being seriously interested in old buildings and issues such as dampness, I took a lot of
photos which illustrate the problems they have. I don't think these are attributable to rising damp (if it really exists!), but more largely due to the continually damp and corrosive atmosphere. Anything close to the water will be washed frequently by natural or man made waves as well as the damp breeze, and so erosion is hardly surprising and is visible everywhere (photo left).
What matters, sadly, is that there has been much use of CEMENT (aaaargh!) and the effects of this are all too readily visible, especially where repointing has been done.
The next two photos on the right show all too clearly what happens when a lime wall is re-pointed with cement. It might look fine to start with, but ultimately the brick (or stone) starts to spall (i.e. lose its surface) because of the continual presence of the water in the brick which should escape
via the pointing but cannot. The upper photo is a classic showing how the brick recedes into the wall.
Cement is also used for rendering, with the result that it comes off in sheets. The photos left and below show cement render just falling off a brick wall.
Another technical issue if the frequent use of stone in an unnatural
bed, i.e. laid with the natural grain (due to being sedimentary) at
right angles to the ground. This encourages vertical splits and just
looks wrong anyway, as shown left in a wall where there is also spalling brickwork due to cement pointing.
This sort of thing is evident everywhere, and I fear for the future of the buildings for this reason alone, never mind the rising sea levels. Unfortunately they seem to have made their natural problems worse by their own poor maintenance practices. However, on the plus side, they do have lots of lovely old buildings (right), even though most of them look in need of a bit of TLC!
fascinating, and it really takes a visit to understand how this small island (or rather a set of smaller islands) is set in a large lagoon with other inhabited islands around. Much of the lagoon is very shallow and so is un-navigable by everything except the smallest boats, and it is not clear to the eye whether the sea is taking back the land, or the land is being reclaimed from the sea! Probably a bit of both, I fancy.
The Venetians have not helped their predicament by allowing very large ships to dock on the north side of the main island, i.e. the side furthest from the Adriatic Sea. To accomodate these 100,000 tonne monsters (each with over 5,000 passengers!) they require to keep the waterway past St Mark's Square dredged to about 50 feet, which surely cannot help but encourage the town itself to settle gently? We were told that most houses are so damp that the ground floor is not used, and there is often as little as a foot difference between the water and ground that we walked on!
photos which illustrate the problems they have. I don't think these are attributable to rising damp (if it really exists!), but more largely due to the continually damp and corrosive atmosphere. Anything close to the water will be washed frequently by natural or man made waves as well as the damp breeze, and so erosion is hardly surprising and is visible everywhere (photo left).
What matters, sadly, is that there has been much use of CEMENT (aaaargh!) and the effects of this are all too readily visible, especially where repointing has been done.
The next two photos on the right show all too clearly what happens when a lime wall is re-pointed with cement. It might look fine to start with, but ultimately the brick (or stone) starts to spall (i.e. lose its surface) because of the continual presence of the water in the brick which should escape
via the pointing but cannot. The upper photo is a classic showing how the brick recedes into the wall.
Cement is also used for rendering, with the result that it comes off in sheets. The photos left and below show cement render just falling off a brick wall.
Another technical issue if the frequent use of stone in an unnatural
bed, i.e. laid with the natural grain (due to being sedimentary) at
right angles to the ground. This encourages vertical splits and just
looks wrong anyway, as shown left in a wall where there is also spalling brickwork due to cement pointing.This sort of thing is evident everywhere, and I fear for the future of the buildings for this reason alone, never mind the rising sea levels. Unfortunately they seem to have made their natural problems worse by their own poor maintenance practices. However, on the plus side, they do have lots of lovely old buildings (right), even though most of them look in need of a bit of TLC!
Subscribe to:
Posts (Atom)













