The screed uses NHL5 and sharp sand, in a 1:2 mix by volume, 75mm thick (as advised by Mike Wye). Be advised that a LOT of sand is needed! For some reason I have had trouble in calculating the required amounts of sand and NHL5, and we ran out of both during the first day, so stopped with two-thirds completed (see join across the floor in the photo on the right).
I bought some more of everything and we finished the job two days later. It was much easier to do than the slab, as we had a decent solid base to work on, and Chris now loves to work with lime.Chris is a bit of a perfectionist and was slightly upset with the need for a join; he was then even more upset to discover that the last half tonne of sand was from a different supplier and so was a darker colour (although you can't see it in the photo).
|
| This is me not Chris as I deleted the photo of him by accident |
The sand situation was not helped by my general lack of understanding about volumes and weights of sand. I suppose I should not have been surprised as, after all, I knew how much stuff had come out of the ground in the kitchen. We ended up using just over three tonnes for a 21 sq metre floor. As I expected to use less than two tonnes, I had a one tonne bulk bag of sand delivered, and supplemented this with repeated visits to a local DIY store to buy their loss-leading bagged sand at £1.07 for a 25kg bag (in a quantity of ten or more). The result of using more than three tonnes was that I made a lot of unexpected visits, and they ran out!
So far as I can tell, our floor must be thicker than designed - perhaps the slab sank a bit on the loose lay LECA? We laid the screed up to a fixed level (as opposed to laying a specific depth), so it might have been deeper in places without us noticing. Otherwise I do not see where all the mix went went. The floor area is 21 sq metres and I was told I would need 21 bags of NHL5 (i.e. one per sq metre); we had four bags left from the slab (why?) so that made 25 to start with, and yet we ended up needing 30 altogether - so each mix only did 0.7 sq metre.
For the technically minded, we used a large diesel drum mixer on hire as we realized that my own mixer was too small - we would have been doing twice as many mixes! In truth, the hired mixer was also too small, as it took 30 mixes to do the screed; if you overload it then it won't mix properly. Each mix comprised one 25 kg bag of NHL5 (30-35 litres) and four and a half 25 kg bags of sharp sand (about 70 litres), and used about 15 litres of water. Other people recommend a pan mixer for better mixing - we did not experience much balling, having followed the mixing method recommended by the manufacturers (although there was more balling with the LECA - see Part 1 - and we did have to stop it and scrape the mixture off the interior, which was tedious). One unexpected issue was that my wheelbarrow is now on its last legs - two welds have broken and the sides have bowed out.
Then it was the weekend so I went to see my grandson:
![]() |
| Proud Grandad with sleeping grandson |
This blog entry was late in being uploaded for various reasons such as tiredness.